Back to bathroom remodel contractors
Michael Hayes Construction
- Based in
- Fairfax
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 1 permit filed
48 permits since 2000: 38 completed, 1 never finaled, 9 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2021 | Completed final sign-off Feb 2022 | 3845 California St | unit #2: replace existing kitchen cabinets, countertops, sink, and fixtures(same layout) and one bathroom. replace existing tub and toilet in bath (same layout). non structural work.Details
unit #2: replace existing kitchen cabinets, countertops, sink, and fixtures(same layout) and one bathroom. replace existing tub and toilet in bath (same layout). non structural work. | $18,000 |
| Jul 30, 2021 | Completed final sign-off Dec 2021 | 521 Pierce St | remove existing bath and kitchen remnants on lower level, return to original storage. to complay w/physical inspection report #cc-8457Details
remove existing bath and kitchen remnants on lower level, return to original storage. to complay w/physical inspection report #cc-8457 | $2,500 |
| Dec 18, 2019 | Completed final sign-off Dec 2021 | 521 Pierce St | remodel to existing laundry & closet. new full bathroom. new sun tunnels & whole house fan. no exterior, no structural work.Details
remodel to existing laundry & closet. new full bathroom. new sun tunnels & whole house fan. no exterior, no structural work. | $35,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2018 | 3536 Wawona St | convert garage and gr fl to livable space. including master bedroom, full bath, relocate laundry, existing curb cut to be removed.Details
convert garage and gr fl to livable space. including master bedroom, full bath, relocate laundry, existing curb cut to be removed. | $32,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2016 | 1727 31st Av | remodel existing upstairs bathroom, no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel existing upstairs bathroom, no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $12,500 |
| Nov 20, 2015 | Completed final sign-off Feb 2017 | 2674 16th Av | remodel e basement,add bathroom, sliding doors at rear, new stairs to 1st fl. infill existing lightwell at 1st fl with new stair to basement. remodel entry hallway from street. new landing and step at rear yard less then 30" above gradeDetails
remodel e basement,add bathroom, sliding doors at rear, new stairs to 1st fl. infill existing lightwell at 1st fl with new stair to basement. remodel entry hallway from street. new landing and step at rear yard less then 30" above grade | $78,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2015 | 409 Shields St | remodel kitchen with new cabinets, finishes, appliances, lighting, remodel bathroom with new vanity, finishes, fixtures, lighting, replace molded shetrock throughout house as required approx. 150sf.Details
remodel kitchen with new cabinets, finishes, appliances, lighting, remodel bathroom with new vanity, finishes, fixtures, lighting, replace molded shetrock throughout house as required approx. 150sf. | $20,000 |
| Jun 4, 2013 | Completed final sign-off Dec 2013 | 225 Grand View Av | 1. kitchen remodel w/ (n) cabinets, (n) appliances, (n) lighting. 2. (n) master bathroom and (n) closet, (n) can lighting.Details
1. kitchen remodel w/ (n) cabinets, (n) appliances, (n) lighting. 2. (n) master bathroom and (n) closet, (n) can lighting. | $40,000 |
| Jun 23, 2011 | Completed final sign-off Nov 2011 | 2318 12th Av | remodel existing bathroom @ 2nd flr no structural work (n) lighting comply with cec 150(k)Details
remodel existing bathroom @ 2nd flr no structural work (n) lighting comply with cec 150(k) | $6,400 |
| Sep 8, 2009 | Never finaled issued Sep 2009, no final | 34 Prospect Av | install new base cabinets and countertops in the kitchen, new appliances, tile, vanity, toilet in existing bath, compliant lightingDetails
install new base cabinets and countertops in the kitchen, new appliances, tile, vanity, toilet in existing bath, compliant lighting | $32,000 |
| Jun 22, 2006 | Completed final sign-off Jun 2008 | 72 Nido Av | remodel (e) kitchen, 2 baths, no electrical work. no structural work.Details
remodel (e) kitchen, 2 baths, no electrical work. no structural work. | $20,000 |
| Dec 23, 2003 | Expired or cancelled expired Mar 2006 | 43 Prospect Av | install bathroom & closet in the basement & build retaining wall behind bath & stair areaDetails
install bathroom & closet in the basement & build retaining wall behind bath & stair area | $12,000 |
| Nov 3, 2003 | Expired or cancelled expired Mar 2006 | 43 Prospect Av | remodel (e) kitchen/bath.remove old lathe/plaster, re-sheetrock,add new cabinets/fix.re-sheetrockDetails
remodel (e) kitchen/bath.remove old lathe/plaster, re-sheetrock,add new cabinets/fix.re-sheetrock | $16,000 |
| Oct 29, 2002 | Expired or cancelled expired May 2003 | 755 11th Av | install 2 skylights 1 in kitchen & 1 in bathDetails
install 2 skylights 1 in kitchen & 1 in bath | $4,000 |
| Sep 20, 2002 | Completed final sign-off May 2003 | 755 11th Av | remodel 2 existing kitchens & 2 existing bathrooms.no structural work.Details
remodel 2 existing kitchens & 2 existing bathrooms.no structural work. | $30,000 |
| Nov 8, 2001 | Completed final sign-off Apr 2002 | 4430 Cabrillo St | kitchen/bath remodelDetails
kitchen/bath remodel | $8,000 |
| Aug 15, 2000 | Completed final sign-off Feb 2001 | 2423 Leavenworth St | remodel bathroom on middle unitDetails
remodel bathroom on middle unit | $7,000 |