Back to pergola or trellis contractors
Michael Dulay
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jan 2026
- Last 24 months
- 1 permit filed
6 permits since 2000: 3 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 completed. Typically 2 days from filing to permit and 12 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2016 | Completed final sign-off Apr 2016 | 428 Yerba Buena Av | add wood trellis above garage door, new landscape sub panel and spa disconnect, 3/4" gas stub from existing bbq to future firepitDetails
add wood trellis above garage door, new landscape sub panel and spa disconnect, 3/4" gas stub from existing bbq to future firepit | $3,500 |