Back to bathroom remodel contractors
Michael B Schultz
- Based in
- Corte Madera
- On San Francisco permits
- Sep 2007 to Sep 2007
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 20 Gold Mine Dr | remove/retile bath, same tub & location, new toilet, same location, corian on existing tub deck, new paint on new drywall, replace shower pan. add new pedestal sink, (e) light fixture to remain.Details
remove/retile bath, same tub & location, new toilet, same location, corian on existing tub deck, new paint on new drywall, replace shower pan. add new pedestal sink, (e) light fixture to remain. | $25,000 |