Back to bathroom remodel contractors
Mez-Con Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Oct 2014
- Last 24 months
- 0 permits filed
17 permits since 2000: 11 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2014 | Completed final sign-off Oct 2014 | 68 Douglass St | revision to 201408113465. convert single bath to 2 baths. 2nd fl including modification to bedroom closetDetails
revision to 201408113465. convert single bath to 2 baths. 2nd fl including modification to bedroom closet | |
| Aug 11, 2014 | Completed final sign-off Oct 2014 | 68 Douglass St | remodel of two bathrooms to include: new bath tub, shower, sink/vanity, floor/wall tile. upgrade plumbing and electrical . install occupancy sensors.Details
remodel of two bathrooms to include: new bath tub, shower, sink/vanity, floor/wall tile. upgrade plumbing and electrical . install occupancy sensors. | $18,000 |
| Dec 31, 2012 | Never finaled issued Sep 2013, no final | 350 Pennsylvania Av | create 2 tier exterior deck at 2nd story and roof. rebuild bathroom roof from shed roof to flat roofDetails
create 2 tier exterior deck at 2nd story and roof. rebuild bathroom roof from shed roof to flat roof | $25,000 |
| Dec 7, 2012 | Never finaled issued Dec 2012, no final | 350 Pennsylvania Av | exterior bathroom wall (10.5) flush with extg exterior wall on lower level. relocate window. install new siding to match. revision to 201209139684.Details
exterior bathroom wall (10.5) flush with extg exterior wall on lower level. relocate window. install new siding to match. revision to 201209139684. | $11,000 |
| Sep 13, 2012 | Never finaled issued Oct 2012, no final | 350 Pennsylvania Av | interior remodel to includes: bathrooms (3), kitchen, master bedroom, windows, doors, trim and flooring. addition of 1/2 bath on 1st floor.Details
interior remodel to includes: bathrooms (3), kitchen, master bedroom, windows, doors, trim and flooring. addition of 1/2 bath on 1st floor. | $65,000 |
| Apr 29, 2009 | Completed final sign-off Dec 2009 | 4316 26th St | bathroom remodel: remove bath tub, install shower stall, sink, toilet, walland floor tile, deck repair, remove dryrot damaged joists, replace with new material and roofing, at grnd flr: repair in kind under 50% of deck and stairs, not visible from the streetDetails
bathroom remodel: remove bath tub, install shower stall, sink, toilet, walland floor tile, deck repair, remove dryrot damaged joists, replace with new material and roofing, at grnd flr: repair in kind under 50% of deck and stairs, not visible from the street | $24,000 |
| Mar 6, 2009 | Expired or cancelled expired Jul 2011 | 877 Alvarado St | 3rd fl remodel, install insulation, 5/8" type x, drywall, floorng. 1 bath: shower, sinks, toilet, and tile work. removal of drywall in 2 of 3 stories may trigger mandatory seismicDetails
3rd fl remodel, install insulation, 5/8" type x, drywall, floorng. 1 bath: shower, sinks, toilet, and tile work. removal of drywall in 2 of 3 stories may trigger mandatory seismic | $25,000 |