Metzler Brothers General Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to Sep 2026
- Last 24 months
- 19 permits filed
79 permits since 2000: 63 completed, 5 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 7 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 7 completed. Typically 94 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 50 Samoset St | repair deck ledger and space away from house, less than 50 % repairs, replace joist hangers at ledger, repair siding on side and back of home. non street facing all in back of home.Details
repair deck ledger and space away from house, less than 50 % repairs, replace joist hangers at ledger, repair siding on side and back of home. non street facing all in back of home. | $13,000 |
| Mar 14, 2024 | Completed final sign-off Sep 2024 | 526 Pacheco St | structural repair of (e) rear yard 1-story deck; replace posts, girder, railing & foundations; remove 4'-2" width portion of deck @ east side; replace (e) 2nd floor door to deck w/windowDetails
structural repair of (e) rear yard 1-story deck; replace posts, girder, railing & foundations; remove 4'-2" width portion of deck @ east side; replace (e) 2nd floor door to deck w/window | $47,000 |
| Nov 1, 2023 | Completed final sign-off Jul 2025 | 179 Ripley St | one bathroom remodel w/ all new fixtures and finishes in kind in location. replace kitchen counters, replace rear deck decking boards.Details
one bathroom remodel w/ all new fixtures and finishes in kind in location. replace kitchen counters, replace rear deck decking boards. | $45,000 |
| Jun 20, 2023 | Completed final sign-off Mar 2024 | 2928 Irving St | remove non-load bearing wall btwn 2 rear ground floor rooms & convert to bedroom. connect rear habitable space to interior staircase create fire rated separation btwn conditioned space, stair & corridor to garage cappign stem wall at rear room. replace substandarized deck post footings.Details
remove non-load bearing wall btwn 2 rear ground floor rooms & convert to bedroom. connect rear habitable space to interior staircase create fire rated separation btwn conditioned space, stair & corridor to garage cappign stem wall at rear room. replace substandarized deck post footings. | $28,000 |
| May 11, 2022 | Completed final sign-off Jun 2022 | 3608 16th St | in kind repair of one back deck ledgerDetails
in kind repair of one back deck ledger | $5,200 |
| Oct 6, 2021 | Completed final sign-off Jul 2023 | 2736 Bush St | in-fill of (e) deck for pantry. remodel kitchen per plan. remodel 2 baths in kind.Details
in-fill of (e) deck for pantry. remodel kitchen per plan. remodel 2 baths in kind. | $12,000 |
| Jun 17, 2014 | Completed final sign-off Aug 2014 | 1941 Webster St | repair extg deck, floor joist, post, and footingDetails
repair extg deck, floor joist, post, and footing | $12,000 |