Metz Construction
- Based in
- Berkeley
- On San Francisco permits
- Apr 2011 to Jun 2015
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2015 | Completed final sign-off Jul 2016 | 701 Cesar Chavez St | occupancy use change only. install new staff kitchen. new accessibility features to steps, new handrails & grab bars. from warehouse to factory. no work to be done. maher n/aDetails
occupancy use change only. install new staff kitchen. new accessibility features to steps, new handrails & grab bars. from warehouse to factory. no work to be done. maher n/a | $2,000 |
| May 14, 2015 | Expired or cancelled withdrawn Sep 2015 | 701 Cesar Chavez St | convert old non-use bathrooms to kitchenette n/a for the maher.Details
convert old non-use bathrooms to kitchenette n/a for the maher. | $45,000 |
| Jul 31, 2012 | Completed final sign-off Sep 2012 | 653 Lake St | repair fire damaged roof, roof deck and parapet including, rafter & wall connections, parapet wall sheathing & strengthening roof rafters at damaged area only.Details
repair fire damaged roof, roof deck and parapet including, rafter & wall connections, parapet wall sheathing & strengthening roof rafters at damaged area only. | $20,000 |
| Nov 30, 2011 | Completed final sign-off Jul 2012 | 2222 15th St | revise detail to pa#201111179078, foundation detail sheet 9/a-2 as noted on plan. revise special inspection requirements.Details
revise detail to pa#201111179078, foundation detail sheet 9/a-2 as noted on plan. revise special inspection requirements. | $300 |
| Nov 21, 2011 | Completed final sign-off Jul 2012 | 2222 15th St | comply with physical inspection report #cc-5992, all items, see reportDetails
comply with physical inspection report #cc-5992, all items, see report | $17,000 |
| Nov 17, 2011 | Completed final sign-off Jul 2012 | 2222 15th St | to abate items #8 & 9 in plumbing inspection portion of unit 2222-a of physical report #cc-5992, by replace non-conforming bathroom with relocated bathroom, remove non conforming fixtures. install new wall & door to seperate garage & laundry area on 1st floor, & all associated structural workDetails
to abate items #8 & 9 in plumbing inspection portion of unit 2222-a of physical report #cc-5992, by replace non-conforming bathroom with relocated bathroom, remove non conforming fixtures. install new wall & door to seperate garage & laundry area on 1st floor, & all associated structural work | $18,000 |
| Apr 7, 2011 | Never finaled issued Apr 2011, no final | 383 Fair Oaks St | legalize work to comply with nov #201197026 in basement,including laundry.Details
legalize work to comply with nov #201197026 in basement,including laundry. | $10,000 |