Back to kitchen remodel contractors
Merlyn Construction
- Based in
- Richmond
- On San Francisco permits
- Aug 2017 to Aug 2026
- Last 24 months
- 16 permits filed
72 permits since 2000: 64 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 602 Oak St | kitchen remodel, replace appliances, replace floors 190 sq ft, replace counter tops, cut and patch drywall for electrical work, kitchen cabinets will remain and be painted, all work interior.Details
kitchen remodel, replace appliances, replace floors 190 sq ft, replace counter tops, cut and patch drywall for electrical work, kitchen cabinets will remain and be painted, all work interior. | $23,500 |
| Oct 27, 2023 | Completed final sign-off Nov 2023 | 937 Goettingen St | replace kitchen window located on the back of the house, not visible from the street. same size.Details
replace kitchen window located on the back of the house, not visible from the street. same size. | $3,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2020 | 2563 Clay St | unit 7: bathroom and kitchen remodel. replace 3 windows in the unit (retrofit) fiberglass, windows not visible from the street. kitchen size approx 8x12, bathroom 8x5Details
unit 7: bathroom and kitchen remodel. replace 3 windows in the unit (retrofit) fiberglass, windows not visible from the street. kitchen size approx 8x12, bathroom 8x5 | $28,000 |
| Feb 27, 2018 | Completed final sign-off Jun 2018 | 844 Detroit St | voluntary structural strengthening and kitchen remodl per plan. new skylight at kitchenDetails
voluntary structural strengthening and kitchen remodl per plan. new skylight at kitchen | $45,000 |