Back to bathroom remodel contractors
Merlyn Construction
- Based in
- Richmond
- On San Francisco permits
- Aug 2017 to Aug 2026
- Last 24 months
- 16 permits filed
72 permits since 2000: 64 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2024 | Completed final sign-off Sep 2024 | 740 Moultrie St | bathroom remodel, including dry rot and framing repair in kindDetails
bathroom remodel, including dry rot and framing repair in kind | $21,500 |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 602 Oak St | revision to bp #202307142173. fix dry rot as needed, less than 100 square feet. replace existing bathroom window, not visible fom street. u=.30max window sill is equal or greater than 60"aff.Details
revision to bp #202307142173. fix dry rot as needed, less than 100 square feet. replace existing bathroom window, not visible fom street. u=.30max window sill is equal or greater than 60"aff. | $3,500 |
| Jul 14, 2023 | Completed final sign-off Oct 2023 | 602 Oak St | existing bathroom renovation on 2nd floorDetails
existing bathroom renovation on 2nd floor | $20,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1615 Quesada Av | remodel 1 bathroom, replace bathroom window not visible from street, replace subfloor due to water damage on den area approx 275 sq ft, replace 775 sq ft of drywall (5/8) sheetrock including the garage side. all work done in kind.Details
remodel 1 bathroom, replace bathroom window not visible from street, replace subfloor due to water damage on den area approx 275 sq ft, replace 775 sq ft of drywall (5/8) sheetrock including the garage side. all work done in kind. | $29,500 |
| Feb 10, 2022 | Completed final sign-off May 2022 | 775 28th Av | replace shower and bathroom floor due to water damange. replace wood if necessary. including the shower pan. bathroom located in the 3/f, repair in-kindDetails
replace shower and bathroom floor due to water damange. replace wood if necessary. including the shower pan. bathroom located in the 3/f, repair in-kind | $20,000 |
| Jul 14, 2021 | Completed final sign-off Sep 2021 | 782 Dolores St | one bathroom remodel, replace bathroom fixtures and upgrade electrical in the bathroom, new tile bath walls and floor non structuralDetails
one bathroom remodel, replace bathroom fixtures and upgrade electrical in the bathroom, new tile bath walls and floor non structural | $21,000 |
| May 20, 2020 | Completed final sign-off Jul 2021 | 825 Rolph St | add sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight.Details
add sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight. | $20,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2020 | 2563 Clay St | unit 7: bathroom and kitchen remodel. replace 3 windows in the unit (retrofit) fiberglass, windows not visible from the street. kitchen size approx 8x12, bathroom 8x5Details
unit 7: bathroom and kitchen remodel. replace 3 windows in the unit (retrofit) fiberglass, windows not visible from the street. kitchen size approx 8x12, bathroom 8x5 | $28,000 |
| Jul 23, 2019 | Completed final sign-off Aug 2020 | 168 Hancock St | remove int stair, new bathroom, new door and window at rear elevation. new laundry sink, new lighting, voluntary seismic stregthening. ground flr - update rear facing door and window, bay window support voluntary stregthening. remodel bathroomDetails
remove int stair, new bathroom, new door and window at rear elevation. new laundry sink, new lighting, voluntary seismic stregthening. ground flr - update rear facing door and window, bay window support voluntary stregthening. remodel bathroom | $30,000 |
| May 22, 2018 | Completed final sign-off Nov 2018 | 771 Teresita Bl | interior renovation on 1st fl - convert (e) garage into master suite, add laundry and bathroom; new replacment window and patio door at rear facade; new electric, plumbing work at affected areasDetails
interior renovation on 1st fl - convert (e) garage into master suite, add laundry and bathroom; new replacment window and patio door at rear facade; new electric, plumbing work at affected areas | $100,000 |