Mendoza Construction
- Based in
- Prunedale
- On San Francisco permits
- Jul 2007 to Dec 2007
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 841 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2007 | Completed final sign-off Mar 2010 | 801 Excelsior Av | new deck 10 x 20, 30" above grade, install new french door, remove (e) door @ 1/f, remove wall to bathroom (e) to expand @ 1/f, move toilet, refer appl#9416995 for (e) full bath & bedroom, stucco exterior around door, install shower @ 1/f.Details
new deck 10 x 20, 30" above grade, install new french door, remove (e) door @ 1/f, remove wall to bathroom (e) to expand @ 1/f, move toilet, refer appl#9416995 for (e) full bath & bedroom, stucco exterior around door, install shower @ 1/f. | $15,000 |
| Jul 9, 2007 | Never finaled issued Jul 2007, no final | 580 Victoria St | repair existing balcony. remove and rplace joists/121 2x8x4 pt, remove and replace deck boards, remove and replace 2x6 rail cap, less than 50% of structure,fasteners to be hot dipped galvanized or stainless steelDetails
repair existing balcony. remove and rplace joists/121 2x8x4 pt, remove and replace deck boards, remove and replace 2x6 rail cap, less than 50% of structure,fasteners to be hot dipped galvanized or stainless steel | $1,000 |