Back to bathroom remodel contractors
Mela Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Jun 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 expired or cancelled. Typically 3 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2022 | Completed final sign-off Mar 2023 | 2374 29th Av | interior remodel of whole house: 2 bedrooms,1 bath, 1 kitchen, sunroom, living room& front foyer. new electric wiring, add new subpanel,new recessed lights in kitchen, bath, livingroom with #16w.replace gas fireplace & furnace. no structural or wall mods. all work in-kind. no work to exterior.Details
interior remodel of whole house: 2 bedrooms,1 bath, 1 kitchen, sunroom, living room& front foyer. new electric wiring, add new subpanel,new recessed lights in kitchen, bath, livingroom with #16w.replace gas fireplace & furnace. no structural or wall mods. all work in-kind. no work to exterior. | $150,000 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 839 14th St | add new guess bathroom in the hallway (shower) full bathroom, new shower vanity toilet. build new master bathroom close existing door to open new opening to bath new hardwood floors, new kitchen countertop new recess light in kitchen and hallway.Details
add new guess bathroom in the hallway (shower) full bathroom, new shower vanity toilet. build new master bathroom close existing door to open new opening to bath new hardwood floors, new kitchen countertop new recess light in kitchen and hallway. | $100,000 |
| Apr 14, 2022 | Completed final sign-off Feb 2023 | 875 La Playa | #271: remodel 1 kitchen and 1 bathroom. replace kitchen plumbing & lighting fixtures, appliances, cabinets & counter tops, vanity and tile floor. new ceiling lighting fixtures. replace electrical panel. replace flooring throughout. replace extg wood burning fire place with new electrical insert.Details
#271: remodel 1 kitchen and 1 bathroom. replace kitchen plumbing & lighting fixtures, appliances, cabinets & counter tops, vanity and tile floor. new ceiling lighting fixtures. replace electrical panel. replace flooring throughout. replace extg wood burning fire place with new electrical insert. | $40,000 |
| Jan 25, 2022 | Completed final sign-off Feb 2023 | 827 33rd Av | convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit.Details
convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit. | $25,000 |
| Dec 22, 2021 | Completed final sign-off Jul 2022 | 44 Macondray Ln | remodel e kitchen, master bedroom, guest bath. new elec outlets, 2 switches, update e elec subpanel, new fough valve of shower,toilet,faucet "no structural work - no wall/framing modifications"Details
remodel e kitchen, master bedroom, guest bath. new elec outlets, 2 switches, update e elec subpanel, new fough valve of shower,toilet,faucet "no structural work - no wall/framing modifications" | $60,000 |
| May 17, 2021 | Completed final sign-off Jun 2021 | 672 27th Av | one bathroom remodel, new electric light, fan, gfc outlet. plumbin for new rough wall. building new niche frame, in bathroom, new installation, new drywall.Details
one bathroom remodel, new electric light, fan, gfc outlet. plumbin for new rough wall. building new niche frame, in bathroom, new installation, new drywall. | $20,000 |
| Oct 23, 2020 | Completed final sign-off May 2021 | 340 06th St | replace interior doors, stair treads and risers, remodel kitchen and remodel bathroom. add closets and relocate washer and dryer.Details
replace interior doors, stair treads and risers, remodel kitchen and remodel bathroom. add closets and relocate washer and dryer. | $20,000 |
| Mar 6, 2020 | Expired or cancelled cancelled Aug 2020 | 3550 Market St | upgrade e bathroom in the hallway, upgrade master bath, new showerpan. install new recessed lights in the kitchen, lr, bathDetails
upgrade e bathroom in the hallway, upgrade master bath, new showerpan. install new recessed lights in the kitchen, lr, bath | $25,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2021 | 620 Foerster St | comply with nov 201398721 and merging 1st fl with 2nd floor. addition of media room and addition of bathroom on 1st floor. renovation of kitchen and bathroom on 2nd floor.Details
comply with nov 201398721 and merging 1st fl with 2nd floor. addition of media room and addition of bathroom on 1st floor. renovation of kitchen and bathroom on 2nd floor. | $30,000 |
| Apr 13, 2018 | Expired or cancelled expired Jan 2025 | 660 Naples St | rear addition with new bedroom, bathroom, closets & hall. existing bath remodel.Details
rear addition with new bedroom, bathroom, closets & hall. existing bath remodel. | $90,000 |