Mec Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Dec 2016
- Last 24 months
- 0 permits filed
26 permits since 2000: 17 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 176 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2015 | Never finaled issued Aug 2015, no final | 217 10th Av | new roof deck, interior alterations, new deck in rear yard, infill lightwell @ 1st floor only & seismic upgrade. re-stucco facade and replace windows with wood or aluminum-clad sash.Details
new roof deck, interior alterations, new deck in rear yard, infill lightwell @ 1st floor only & seismic upgrade. re-stucco facade and replace windows with wood or aluminum-clad sash. | $534,100 |