Back to bathroom remodel contractors
Me Design & Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Jan 2009 to Apr 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 6 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2009 | Completed final sign-off Jul 2009 | 954 Rhode Island St | kitchen & bath remodel due to fire damages only on downstairs unit. minimum 50% of kitchen light watt be of fluorescent. provide exhaust fan & fluorescent llights or "manual on" occupancy sensor in bathroom.Details
kitchen & bath remodel due to fire damages only on downstairs unit. minimum 50% of kitchen light watt be of fluorescent. provide exhaust fan & fluorescent llights or "manual on" occupancy sensor in bathroom. | $75,000 |