Md Companies
- Based in
- Pleasant Hill
- On San Francisco permits
- Mar 2018 to Apr 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 7 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Sep 2023 | 66 Cleary Ct | replce (e) cabinets and appliances in kitchen in same location. no structural work. replace (e) vanity and shower enclosure in bathrooms, in same location. no structural workDetails
replce (e) cabinets and appliances in kitchen in same location. no structural work. replace (e) vanity and shower enclosure in bathrooms, in same location. no structural work | $35,000 |
| Mar 16, 2020 | Never finaled issued Aug 2020, no final | 66 Cleary Ct | unit #1010: master and hallway bathroom remodel. replace vanity, toilet, tiles, floor and wall - no relocate. replace shower and bathtub faucet. demo 1 non-beraing wall in master bathroom.Details
unit #1010: master and hallway bathroom remodel. replace vanity, toilet, tiles, floor and wall - no relocate. replace shower and bathtub faucet. demo 1 non-beraing wall in master bathroom. | $7,000 |
| Jul 20, 2018 | Completed final sign-off Jun 2019 | 66 Cleary Ct | remodeling 2 bathrooms and 1 kitchen, plmg and elec in bathrooms will keep same location. kitchen will remove non bearing wall.Details
remodeling 2 bathrooms and 1 kitchen, plmg and elec in bathrooms will keep same location. kitchen will remove non bearing wall. | $45,000 |
| Mar 30, 2018 | Completed final sign-off May 2018 | 40 Topaz Wy | remodeling bathroom.Details
remodeling bathroom. | $3,000 |