Back to bathroom remodel contractors
Mcginley Building
- Based in
- Berkeley
- On San Francisco permits
- Jan 2005 to Mar 2012
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2011 | Completed final sign-off Oct 2012 | 3914 24th St | revision to 201006164603: revision to bathroomDetails
revision to 201006164603: revision to bathroom | |
| Aug 31, 2009 | Completed final sign-off Sep 2009 | 682 Douglass St | change bathroom to storage area to comply with nov 200993860 on basement. revision to pa# 2008.03.13.6997.Details
change bathroom to storage area to comply with nov 200993860 on basement. revision to pa# 2008.03.13.6997. | $350 |
| Mar 13, 2008 | Completed final sign-off Sep 2009 | 682 Douglass St | extension at rear to create single story structure to extend exist. bedroom, remodel exist bathroom, remodel exist bedroom,add toilet/bowl closet. add three skylights. new extension will enclose new stair to existing ground floor.Details
extension at rear to create single story structure to extend exist. bedroom, remodel exist bathroom, remodel exist bedroom,add toilet/bowl closet. add three skylights. new extension will enclose new stair to existing ground floor. | $95,000 |
| Sep 5, 2007 | Never finaled issued Sep 2007, no final | 3870 25th St | add skylight 2'x 2' and less than 1'-0" in height for (e)bathroom on 2nd fl/ top floor.Details
add skylight 2'x 2' and less than 1'-0" in height for (e)bathroom on 2nd fl/ top floor. | $850 |
| Jul 30, 2007 | Completed final sign-off Nov 2007 | 3870 25th St | install washer /dryer, install shower / basin , build new bath , rock bed room.Details
install washer /dryer, install shower / basin , build new bath , rock bed room. | $41,000 |
| Jan 30, 2007 | Completed final sign-off Dec 2007 | 1872 Church St | remodel kitchen/bath/wash room. alteration to floor plan, install door from bedroom to hallway, remove rear bedroom to lightwell. use 50% flourescent lightsDetails
remodel kitchen/bath/wash room. alteration to floor plan, install door from bedroom to hallway, remove rear bedroom to lightwell. use 50% flourescent lights | $35,000 |