Back to bathroom remodel contractors
Mccowan Berrones & Company Llc
- Based in
- San Rafael
- On San Francisco permits
- Sep 2024 to Dec 2025
- Last 24 months
- 5 permits filed
6 permits since 2000: 2 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 39 days from filing to permit and 434 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2025 | Completed final sign-off Feb 2026 | 310 Sanchez St | interior remodel of primary bathroom, conversion of bath tub to shower. replacement of (2) exterior rear doors, repair of dryrot at rear siding and entry stair landing (within property line)Details
interior remodel of primary bathroom, conversion of bath tub to shower. replacement of (2) exterior rear doors, repair of dryrot at rear siding and entry stair landing (within property line) | $25,000 |
| Nov 19, 2024 | Completed final sign-off Jun 2026 | 618 12th Av | 1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet.Details
1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet. | $571,275 |