- 3 permits filed
34 permits since 2000: 32 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 in progress. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | Completed final sign-off May 2026 | 3472 16th St | remodel a kitchen and remodel an existing bathroom. bathroom #2 has a tub and vanity that will be changed out like for like, similarly kitchen will have sink and countertops will be changed out like for like.Details
remodel a kitchen and remodel an existing bathroom. bathroom #2 has a tub and vanity that will be changed out like for like, similarly kitchen will have sink and countertops will be changed out like for like. | $10,000 |
| Mar 23, 2026 | Completed final sign-off May 2026 | 3472 16th St | propose to build a full bathroom in a closet/stroage room that is 8ft by 8 ft without moving walls. a (n) electrical circuit will be added and plumbing will hook up to the (e) plumbing fixtures. all work is on the 2nd floor interior onlyDetails
propose to build a full bathroom in a closet/stroage room that is 8ft by 8 ft without moving walls. a (n) electrical circuit will be added and plumbing will hook up to the (e) plumbing fixtures. all work is on the 2nd floor interior only | $15,000 |
| Apr 25, 2024 | Completed final sign-off Mar 2025 | 765 Cole St | remodel (e) 1 bathroom and making it longer by removing hallway closet and building new walls. new locations for plumbing and electrical fixtures.Details
remodel (e) 1 bathroom and making it longer by removing hallway closet and building new walls. new locations for plumbing and electrical fixtures. | $20,000 |
| Feb 12, 2024 | In progress issued Feb 2024 | 765 Cole St | to remove wall covering and floor covering to see if wood is rotten before bathroom remodel. discovery.Details
to remove wall covering and floor covering to see if wood is rotten before bathroom remodel. discovery. | $1,000 |
| Jan 18, 2023 | Completed final sign-off Jun 2023 | 763 Cole St | to comply with nov 201920714 #2,3,4,5,7,8( reapir stairs) upper level 3rd story full bathroom remodel, change tub, sink, for like, new tile around tub.Details
to comply with nov 201920714 #2,3,4,5,7,8( reapir stairs) upper level 3rd story full bathroom remodel, change tub, sink, for like, new tile around tub. | $15,000 |
| May 18, 2022 | Completed final sign-off May 2023 | 1235 Egbert Av | remodel (1) bathroom, like for like @ ground floor: replace sheetrock in 2 rooms at ground floor and correct any plumbing and electrical in walls that are opened.Details
remodel (1) bathroom, like for like @ ground floor: replace sheetrock in 2 rooms at ground floor and correct any plumbing and electrical in walls that are opened. | $20,000 |
| Mar 24, 2022 | Completed final sign-off Oct 2022 | 3819 24th St | apt a: kitchen & bathroom remodel. change gas water heater to electric. change laundry sink to stand pipe drain. replace like-for-like tub, cabinets, tile & dish washer. install floor drain for water heater. insulation walls + ceiling. change wires & install arcfault breakers.circuits where possibleDetails
apt a: kitchen & bathroom remodel. change gas water heater to electric. change laundry sink to stand pipe drain. replace like-for-like tub, cabinets, tile & dish washer. install floor drain for water heater. insulation walls + ceiling. change wires & install arcfault breakers.circuits where possible | $10,000 |
| Jan 27, 2021 | Completed final sign-off May 2022 | 3857 24th St | unit a: replace kitchen counter & cabinets. no new walls. using existing appliances. replacing bathroom fixtures. adding electrical outlets in kitchen. using new subpanel. new electric water heater.Details
unit a: replace kitchen counter & cabinets. no new walls. using existing appliances. replacing bathroom fixtures. adding electrical outlets in kitchen. using new subpanel. new electric water heater. | $20,000 |
| Feb 19, 2015 | Completed final sign-off Oct 2018 | 587 Frederick St | enclose rear popout approx 29 sf @ 2nd & 3rd floor. new half bath @ 2nd floor & full bath @ 3rd floor. new rear stair.Details
enclose rear popout approx 29 sf @ 2nd & 3rd floor. new half bath @ 2nd floor & full bath @ 3rd floor. new rear stair. | $40,000 |
| Jul 31, 2012 | Completed final sign-off Aug 2012 | 3823 24th St | dry rot repair in bathroom under toilet in front office space. repair plywood and joists if needed.Details
dry rot repair in bathroom under toilet in front office space. repair plywood and joists if needed. | $1,000 |