Back to bathroom remodel contractors
Mc Eleney Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Oct 2008
- Last 24 months
- 0 permits filed
28 permits since 2000: 20 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 135 Corbett Av | interior alteration: remodel kitchen, replace (e) fireplace @ 2nd floor, rebuild (e) interior stair, new half bath at 1st floor, relocate (e) water heater & furnace.Details
interior alteration: remodel kitchen, replace (e) fireplace @ 2nd floor, rebuild (e) interior stair, new half bath at 1st floor, relocate (e) water heater & furnace. | $30,000 |
| Apr 30, 2008 | Completed final sign-off Aug 2008 | 842 Rhode Island St | reconfigure staircase and add bathroom. relocate heat vent. relocate window in light well. relocate door to master bedroom.Details
reconfigure staircase and add bathroom. relocate heat vent. relocate window in light well. relocate door to master bedroom. | $30,000 |
| Mar 4, 2008 | Completed final sign-off Jul 2008 | 3530 California St | kitchen remodel, new 1/2 bath in 2nd unit on the 3rd floor including removal of non structural wall.Details
kitchen remodel, new 1/2 bath in 2nd unit on the 3rd floor including removal of non structural wall. | $48,000 |
| Jun 13, 2006 | Completed final sign-off Feb 2007 | 11 Buena Vista Tr | reroof building, putting in six new skylights, upgrading structure of roof, renew bathroom in kind, swap out six windows using existing frames & vinyl windows. replace windows in kind or better.Details
reroof building, putting in six new skylights, upgrading structure of roof, renew bathroom in kind, swap out six windows using existing frames & vinyl windows. replace windows in kind or better. | $25,000 |
| May 26, 2006 | Completed final sign-off May 2007 | 1495 31st Av | add two bedrooms, closets, bathroom, utility room to (e) garage. demolishs (e) second floor bathroom and closets. add new half bathDetails
add two bedrooms, closets, bathroom, utility room to (e) garage. demolishs (e) second floor bathroom and closets. add new half bath | $100,000 |
| Dec 27, 2005 | Expired or cancelled expired Mar 2008 | 335 Casitas Av | remodel kchn/remold one bthrm upstairs,1 bath down stairs and add a bthrm upstairs/remodel 2 rear bedroomDetails
remodel kchn/remold one bthrm upstairs,1 bath down stairs and add a bthrm upstairs/remodel 2 rear bedroom | $45,000 |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 1373 Masonic Av | remodel bathroom, redo countertop and upgrade elec outles in kitchenDetails
remodel bathroom, redo countertop and upgrade elec outles in kitchen | $16,000 |
| May 5, 2005 | Completed final sign-off Oct 2005 | 1509 10th Av | renew kitchen and bathroom. no alterations to doors, walls, or windowsDetails
renew kitchen and bathroom. no alterations to doors, walls, or windows | $30,000 |