Back to bathroom remodel contractors
Maylath Construction
- Based in
- Richmond
- On San Francisco permits
- Jul 2006 to Nov 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 125 04th Av | #2 - install new cabinets & appliances at kitchen. install new tile & fixtures at bathroom & new wood flooring.Details
#2 - install new cabinets & appliances at kitchen. install new tile & fixtures at bathroom & new wood flooring. | $10,000 |
| Apr 16, 2007 | Completed final sign-off Jul 2007 | 90 Chaves Av | bath remodel: change fixtures and tile, insulate, sheetrock, and paint. non structural. lighting must be fluorescent or controlle by motion sensor. exhaust termination 3' min. from p.l.and building openings.Details
bath remodel: change fixtures and tile, insulate, sheetrock, and paint. non structural. lighting must be fluorescent or controlle by motion sensor. exhaust termination 3' min. from p.l.and building openings. | $15,000 |
| Jul 31, 2006 | Completed final sign-off Oct 2006 | 644 Teresita Bl | (1) bath remodel new tile new fixtures (remove and replace old ones) non structuralDetails
(1) bath remodel new tile new fixtures (remove and replace old ones) non structural | $9,000 |