Back to bathroom remodel contractors
Matthew Figlietti
- Based in
- Colma
- On San Francisco permits
- Jun 2010 to Aug 2024
- Last 24 months
- 0 permits filed
31 permits since 2000: 29 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 2 never finaled. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2024 | Completed final sign-off Oct 2024 | 2366 33rd Av | water damage repair. repair drywall & paint (~200sqft). replace bathroom tile floor only. no other bathroom work.Details
water damage repair. repair drywall & paint (~200sqft). replace bathroom tile floor only. no other bathroom work. | $7,500 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 2367 12th Av | no exterior changes. bathroom remodeling: add 1 sink (double sink vanity) relocate toilet, showerremodel. replace exhaust fan , add 2 gfci, add 2 recess lights, add 2 light fixtures.Details
no exterior changes. bathroom remodeling: add 1 sink (double sink vanity) relocate toilet, showerremodel. replace exhaust fan , add 2 gfci, add 2 recess lights, add 2 light fixtures. | $28,480 |
| Sep 10, 2021 | Completed final sign-off Feb 2022 | 3829 Cesar Chavez St | in kind bathroom remodel. no change to existing floor plan or any wall/windows.Details
in kind bathroom remodel. no change to existing floor plan or any wall/windows. | $20,000 |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 3652 Mission St | apt.#1: remodel kitchen: upgrade electrical, drywall, new cabinets, appliances & flooring. remodel half bath: upgrade electrical, drywall, new fixtures, flooring. living room: add lighting & repair drywalll ceiling. drywall repair and paint throughout. kitchen lighting min 50% wattage high efficacy;Details
apt.#1: remodel kitchen: upgrade electrical, drywall, new cabinets, appliances & flooring. remodel half bath: upgrade electrical, drywall, new fixtures, flooring. living room: add lighting & repair drywalll ceiling. drywall repair and paint throughout. kitchen lighting min 50% wattage high efficacy; | $40,000 |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 4332 19th St | residential remodel. 2 bedrooms, 1 bath, sink at garage level. existing baths and kitchen renovated, new elec,plumbing, new trim, wainscoting, replacement of rear windows. paint on interior of residenceDetails
residential remodel. 2 bedrooms, 1 bath, sink at garage level. existing baths and kitchen renovated, new elec,plumbing, new trim, wainscoting, replacement of rear windows. paint on interior of residence | $325,000 |
| Dec 30, 2013 | Never finaled issued Dec 2015, no final | 621 Waller St | - street level: no work. - main level: remodel kitchen, replace (e) doors & windows, eliminate fire place & 1/2 bath. - uppe level: replace (e) french door & guardrails - attic: no work.Details
- street level: no work. - main level: remodel kitchen, replace (e) doors & windows, eliminate fire place & 1/2 bath. - uppe level: replace (e) french door & guardrails - attic: no work. | $200,000 |
| Jul 1, 2013 | Completed final sign-off Jan 2014 | 666 Bay St | kitchen remodel, new fixtures, cabinets, upgrade electrical, new surface, etc. bathroom remodel, new fixtures, tile, upgrade electrical etc. toilet room remodel, new toilet and sink, tile, upgrade electrical etc. laundry room remodel, new fixtures, cabinets, upgrades electrcial etc, new eletricalDetails
kitchen remodel, new fixtures, cabinets, upgrade electrical, new surface, etc. bathroom remodel, new fixtures, tile, upgrade electrical etc. toilet room remodel, new toilet and sink, tile, upgrade electrical etc. laundry room remodel, new fixtures, cabinets, upgrades electrcial etc, new eletrical | $44,000 |
| May 3, 2013 | Completed final sign-off Oct 2013 | 666 Bay St | revision to application 201211154345 - bathroom remodel with new fixtures, surfaces etcDetails
revision to application 201211154345 - bathroom remodel with new fixtures, surfaces etc | $9,500 |
| May 3, 2013 | Completed final sign-off Mar 2014 | 53 Christopher Dr | all work on first floor; bathroom remodel new fixtures, upgraded electrical, new surfaces etc; bedroom remodel, new insulation dry wall, trim, replace plywood subfloor, doors, etc, replace sliding doors and bathroom window, no exterior modification except dry rot and stucco repairDetails
all work on first floor; bathroom remodel new fixtures, upgraded electrical, new surfaces etc; bedroom remodel, new insulation dry wall, trim, replace plywood subfloor, doors, etc, replace sliding doors and bathroom window, no exterior modification except dry rot and stucco repair | $29,000 |
| Feb 21, 2013 | Completed final sign-off Jun 2013 | 668 Bay St | revision to pa# 201301077368. new ceiling, hall, bathrooms, bedrooms, new drywall on some interior walls. insulation on open walls and ceilings. upgrade laundry and water closet/toilet room.Details
revision to pa# 201301077368. new ceiling, hall, bathrooms, bedrooms, new drywall on some interior walls. insulation on open walls and ceilings. upgrade laundry and water closet/toilet room. | $7,500 |
| Nov 15, 2012 | Completed final sign-off Feb 2013 | 3652 Mission St | bathroom remodel, new fixtures, upgraded electrical, tile, new counter top, no exterior workDetails
bathroom remodel, new fixtures, upgraded electrical, tile, new counter top, no exterior work | $8,500 |
| Apr 8, 2011 | Completed final sign-off Jul 2011 | 862 35th Av | bathroom remodel, basic remodel, no structural changes, no windows being moved or enlarged. no doorways being moved or enlarged. replace all fixtures and surfaces. lights shall be high efficacy complying with sfec/cbc150(k)10Details
bathroom remodel, basic remodel, no structural changes, no windows being moved or enlarged. no doorways being moved or enlarged. replace all fixtures and surfaces. lights shall be high efficacy complying with sfec/cbc150(k)10 | $15,000 |