Back to bathroom remodel contractors
Matrix Group One
- Based in
- San Carlos
- On San Francisco permits
- Jun 2025 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 6 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 52 Paramount Tr | remodel kitchen and bath, add 1 bath - electrical and plumbing. new window general remote.Details
remodel kitchen and bath, add 1 bath - electrical and plumbing. new window general remote. | $180,000 |
| Oct 28, 2025 | Completed final sign-off Jun 2026 | 519 Orizaba Av | kitchen and bath remodel. window replacement, new flooring and paint.Details
kitchen and bath remodel. window replacement, new flooring and paint. | $30,000 |
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 255 Amber Dr | revision to pa # 2025-0603-7841 electrical (kitchen): upgrade some kitchen outlets, install gfci outlets as required. 1 bathroom renovation. replace shower enclosure, replace tub and surrounding walls, replace all toilets, replace all vanites.Details
revision to pa # 2025-0603-7841 electrical (kitchen): upgrade some kitchen outlets, install gfci outlets as required. 1 bathroom renovation. replace shower enclosure, replace tub and surrounding walls, replace all toilets, replace all vanites. | $7,500 |
| Jun 12, 2025 | In progress issued Jun 2025 | 519 Orizaba Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |