Back to bathroom remodel contractors
Matarozzi/Pelsinger Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2004 to Jun 2026
- Last 24 months
- 17 permits filed
344 permits since 2000: 259 completed, 18 in progress, 38 never finaled, 29 expired or cancelled.
Of the 38 never-finaled permits, 3 are 3 to 5 years old, 7 are 5 to 10 years old, 28 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
61 bathroom remodel permits: 50 completed, 4 in progress, 4 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Aug 2026 | 3580 Clay St | relocate (e) front entry door, expand rear windows and doors, demo . 1st fl (n) sauna and spa room, rpalce and move (e) water heaters. 2nd fl remodel (e) kitchen, dining and mudroom. demo (e) fireplace 3rd fl remodel 2 (e) bedrooms bathroom and storage rooms demo.Details
relocate (e) front entry door, expand rear windows and doors, demo . 1st fl (n) sauna and spa room, rpalce and move (e) water heaters. 2nd fl remodel (e) kitchen, dining and mudroom. demo (e) fireplace 3rd fl remodel 2 (e) bedrooms bathroom and storage rooms demo. | $970,000 |
| Apr 30, 2026 | In progress issued Jun 2026 | 3580 Clay St | interior renovation of 4th fl which includes renovation of e 1 bath, 1 family room, 1 bedroom and 1 new laundry room and 1/2 bathDetails
interior renovation of 4th fl which includes renovation of e 1 bath, 1 family room, 1 bedroom and 1 new laundry room and 1/2 bath | $270,000 |
| Aug 20, 2025 | In progress issued Jan 2026 | 1948 Great Hy | new 374sf studio converted into adu on g/f of (e) duplex - under state adu. legalize (e) kitchen and bathroom, no layout changes. no exterior changes.Details
new 374sf studio converted into adu on g/f of (e) duplex - under state adu. legalize (e) kitchen and bathroom, no layout changes. no exterior changes. | $15,777 |
| Nov 14, 2023 | Completed final sign-off May 2024 | 2700 22nd St | remodel of primary bathrom and addition of 1/2 bathroom.Details
remodel of primary bathrom and addition of 1/2 bathroom. | $4,500 |
| Jun 16, 2023 | Completed final sign-off Sep 2023 | 2667 Clay St | selective remodel of all floors. scope includes (n) paint, (n) countertops, (n) tile. re-finishing of (e) millwork. re-finishing of (e) interior door. all work to be cosmetic. countertops-1 in kitchen and 1 in bathroom. tile-kitchen blackspash.Details
selective remodel of all floors. scope includes (n) paint, (n) countertops, (n) tile. re-finishing of (e) millwork. re-finishing of (e) interior door. all work to be cosmetic. countertops-1 in kitchen and 1 in bathroom. tile-kitchen blackspash. | $60,000 |
| Jun 8, 2023 | In progress issued Feb 2024 | 2760 Vallejo St | remodel 4 story over basement sfr, modification to rooms & floor layouts, adding bathrooms & kitchen relocation. no modifications to the exterior of building. work limited to interior onlyDetails
remodel 4 story over basement sfr, modification to rooms & floor layouts, adding bathrooms & kitchen relocation. no modifications to the exterior of building. work limited to interior only | $200,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2020 | 3530 Washington St | interior remodel of e residence work includes modification to cabinetry and finishes. kitchen remodel. new powder room accessed from entry foyer, bath remodel, new bath exhaust fansDetails
interior remodel of e residence work includes modification to cabinetry and finishes. kitchen remodel. new powder room accessed from entry foyer, bath remodel, new bath exhaust fans | $150,000 |
| Feb 4, 2020 | Completed final sign-off Oct 2020 | 3530 Washington St | remodel of one bathroom. remove carpet, remove/replace dry rotDetails
remodel of one bathroom. remove carpet, remove/replace dry rot | $75,000 |
| Oct 10, 2018 | Completed final sign-off Apr 2019 | 757 North Point St | unit8: non structural work - replacement of kitchen cabinets, remodel of 2 bathrooms (finishes only). replacement of 4 doors (interior only) and wood flooring. at level 2,no new wall, no existing wall relocation. lighting in kitchen and bathroom remodeling. shall compaly with cec 150.0 (k) 3 & (k) 5Details
unit8: non structural work - replacement of kitchen cabinets, remodel of 2 bathrooms (finishes only). replacement of 4 doors (interior only) and wood flooring. at level 2,no new wall, no existing wall relocation. lighting in kitchen and bathroom remodeling. shall compaly with cec 150.0 (k) 3 & (k) 5 | $150,000 |
| May 17, 2018 | Completed final sign-off Apr 2019 | 2221 Baker St | new cabinetry in laundry and mudroom. reconfigure floor plan to add additional bathroom and colset. remodel 2 e bathrooms, new fixutres and finishes. replace cabinetry in 3 closets. remove existing attic closet and add new cabinetry. maher naDetails
new cabinetry in laundry and mudroom. reconfigure floor plan to add additional bathroom and colset. remodel 2 e bathrooms, new fixutres and finishes. replace cabinetry in 3 closets. remove existing attic closet and add new cabinetry. maher na | $120,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 297 Addison St | residential remodel to include: add 1/2 bathroom at (e) stroage rm, widen (e) interior door at (e) bedroom. add closet at (e) bedroom, add opening with railing at (e) back yard deck, replace (e) extior steps with ramp. plm/ele by sep permitDetails
residential remodel to include: add 1/2 bathroom at (e) stroage rm, widen (e) interior door at (e) bedroom. add closet at (e) bedroom, add opening with railing at (e) back yard deck, replace (e) extior steps with ramp. plm/ele by sep permit | $80,000 |
| Dec 7, 2017 | Completed final sign-off Aug 2021 | 526 Duncan St | addition of study/room at rear of (e) single family house. renovation of (e) water closet to full bath at entry doorDetails
addition of study/room at rear of (e) single family house. renovation of (e) water closet to full bath at entry door | $300,000 |
| Aug 11, 2017 | Completed final sign-off Jun 2022 | 20 Raycliff Tr | remodel (e) 2-story bldg including expansion of basement & addition of 3rd story w/ roof deck - total of (4) bedroom s & (3 1/2) bathrooms.Details
remodel (e) 2-story bldg including expansion of basement & addition of 3rd story w/ roof deck - total of (4) bedroom s & (3 1/2) bathrooms. | $872,000 |
| Jun 5, 2017 | Completed final sign-off Nov 2017 | 1201 Noe St | voluntary seismic upgrade to 1st floor, which includes one steel moment frame and one plywood shear wall. accessibility upgrade to extg bathroom.Details
voluntary seismic upgrade to 1st floor, which includes one steel moment frame and one plywood shear wall. accessibility upgrade to extg bathroom. | $30,000 |
| Feb 13, 2017 | Completed final sign-off Nov 2017 | 495 De Haro St | tenant improvement- convert some (e) warehouse apce in building for use as a small brewery and small tap room/bar. work includes addition of a bathroom, ramp, railings, and egress doors. change of occupancy a-2, f-2 (building) and tap room (retail), maher n/aDetails
tenant improvement- convert some (e) warehouse apce in building for use as a small brewery and small tap room/bar. work includes addition of a bathroom, ramp, railings, and egress doors. change of occupancy a-2, f-2 (building) and tap room (retail), maher n/a | $150,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 7 Kronquist Ct | replace in kind: garage door, electrical fixtures, tile at bath, bath tub, drain and fixtures. interior and exterior paint. no changed wall locations.Details
replace in kind: garage door, electrical fixtures, tile at bath, bath tub, drain and fixtures. interior and exterior paint. no changed wall locations. | $20,000 |
| Jun 20, 2016 | Completed final sign-off Dec 2016 | 3615 20th St | #6 -remodel kitchen & bathroom; incl. ele & plumbing. no relocatio nof walls , new finishes.Details
#6 -remodel kitchen & bathroom; incl. ele & plumbing. no relocatio nof walls , new finishes. | $14,050 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 170 Pacific Av | kitchen and bath remodel. no interior wall relocation or removed.Details
kitchen and bath remodel. no interior wall relocation or removed. | $10,000 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 3536 Washington St | remodel kitchen & bathroom. exploratory demo for structural investigation. no change on walls.Details
remodel kitchen & bathroom. exploratory demo for structural investigation. no change on walls. | $25,000 |
| Oct 27, 2015 | Completed final sign-off Oct 2017 | 2585 Pacific Av | remodel 1st floor kitchen, basement powder room, 1st floor powder room, 4 second floor baths, 3rd floor bath, 3rd floor powder room. replace in kind ceiling. sheetrock some wall sheetrock, upgrade. partial electrical and plumbing. no structural work.Details
remodel 1st floor kitchen, basement powder room, 1st floor powder room, 4 second floor baths, 3rd floor bath, 3rd floor powder room. replace in kind ceiling. sheetrock some wall sheetrock, upgrade. partial electrical and plumbing. no structural work. | $56,000 |
| Jun 3, 2015 | Expired or cancelled expired Jan 2026 | 3751 20th St | new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath.Details
new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath. | $1,500,000 |
| Feb 26, 2015 | Completed final sign-off May 2015 | 690 Market St | #1904 - remove and replace light fixtures (e) toilets; remove and replace carpet, (n) hardwood floor to match (e); new paint throughout; relocate shower to orginal location; new fixtures and finishes in bath; to comply with cec150.0(k)5Details
#1904 - remove and replace light fixtures (e) toilets; remove and replace carpet, (n) hardwood floor to match (e); new paint throughout; relocate shower to orginal location; new fixtures and finishes in bath; to comply with cec150.0(k)5 | $46,200 |
| Dec 3, 2014 | Completed final sign-off Oct 2017 | 2585 Pacific Av | renovate the (e) single fam residence, add a 2 story addition towards the rear yard, extend the (e) third floor area towards the rear yard, enlarge the basement area, structural upgrades as required to meet current seismic code. (1) new bedroom and (1) new bath on third floorDetails
renovate the (e) single fam residence, add a 2 story addition towards the rear yard, extend the (e) third floor area towards the rear yard, enlarge the basement area, structural upgrades as required to meet current seismic code. (1) new bedroom and (1) new bath on third floor | $1,000,000 |
| Jun 26, 2014 | Completed final sign-off Nov 2014 | 3409 Pacific Av | bathroom renovation and electrical upgrade.Details
bathroom renovation and electrical upgrade. | $150,000 |
| Feb 21, 2014 | Completed final sign-off Jul 2016 | 2320 Lyon St | complete interior remodel- expansion at 1st floor new courtyard at side & new retaining walls, (n) media rm, 1-1/2 baths, wine/dining,bedrm @ ground floor. facade modernization w/(n) window layout & new insulated units. (n) pentroom incl bath at (e) attic with (n) roof decks. add bath @ 3rd flrDetails
complete interior remodel- expansion at 1st floor new courtyard at side & new retaining walls, (n) media rm, 1-1/2 baths, wine/dining,bedrm @ ground floor. facade modernization w/(n) window layout & new insulated units. (n) pentroom incl bath at (e) attic with (n) roof decks. add bath @ 3rd flr | $859,000 |
| Dec 20, 2013 | Completed final sign-off Jul 2014 | 360 09th St | new additional ada compliant bathrooms and new offices on 2nd, 3rd, 4th fl. expand existing kitchenette on the 1st flDetails
new additional ada compliant bathrooms and new offices on 2nd, 3rd, 4th fl. expand existing kitchenette on the 1st fl | $125,800 |
| Sep 25, 2013 | Completed final sign-off Jun 2015 | 2700 Lyon St | new master bedroom & 4th floor deck expansion. master bath new skylight. new bay windows on north facade. new deck above backyard on 2nd floor.Details
new master bedroom & 4th floor deck expansion. master bath new skylight. new bay windows on north facade. new deck above backyard on 2nd floor. | $210,000 |
| Aug 15, 2013 | Completed final sign-off Jan 2014 | 2385 Broadway | kitchen remodel: cabinets, plumbing, electrical & painting. master bath remodel: shower, tub, vanity, new fan, tile & paint. guest bathrooms: shower fixtures, tile & paint. no change on wallsDetails
kitchen remodel: cabinets, plumbing, electrical & painting. master bath remodel: shower, tub, vanity, new fan, tile & paint. guest bathrooms: shower fixtures, tile & paint. no change on walls | $110,000 |
| Jul 23, 2013 | Completed final sign-off Apr 2014 | 765 Market St | #phd2 - remodle entry, liv room, dining, master closet, master bath. reconfigure non-structural interior partitions. remove partial non-structual wall & replace with new non-structural walls.Details
#phd2 - remodle entry, liv room, dining, master closet, master bath. reconfigure non-structural interior partitions. remove partial non-structual wall & replace with new non-structural walls. | $100,000 |
| Jun 13, 2013 | Completed final sign-off Feb 2014 | 307 Shotwell St | remodel bathroom, add w.c & new door off bedroom & update electrical and plumbg in rear of residence. rebuild extg fences to same dimensions 10' height fence. add 3'-0" overhang.Details
remodel bathroom, add w.c & new door off bedroom & update electrical and plumbg in rear of residence. rebuild extg fences to same dimensions 10' height fence. add 3'-0" overhang. | $30,000 |
| Jan 10, 2013 | Completed final sign-off Nov 2014 | 2440 Vallejo St | interior renovation of kitchen, baths, new finishes. addition of framing at (e) living room per plan.Details
interior renovation of kitchen, baths, new finishes. addition of framing at (e) living room per plan. | $40,000 |
| Aug 14, 2012 | Never finaled issued Aug 2012, no final | 2221 Baker St | new hardwood flooring & (2) bathrooms remodels on 2nd & 3rd floors, no structural work, replacement of (e) finishes & fixtures only.Details
new hardwood flooring & (2) bathrooms remodels on 2nd & 3rd floors, no structural work, replacement of (e) finishes & fixtures only. | $10,000 |
| Jul 6, 2012 | Completed final sign-off Jun 2015 | 1070 Green St | full renovation of an (e) condo unit, enclose (e) balcony. replace (e) windows in kind. remodel (e) non structural partitions, ceiling finishes & floor finishes. provide new living area, kitchen, bedroom, home office & bathrooms.Details
full renovation of an (e) condo unit, enclose (e) balcony. replace (e) windows in kind. remodel (e) non structural partitions, ceiling finishes & floor finishes. provide new living area, kitchen, bedroom, home office & bathrooms. | $200,000 |
| Jun 19, 2012 | Completed final sign-off Oct 2012 | 2670 Pierce St | remodel (e) kitchern, remodel (e) bathroom, replace bathroom window in kind, replace kitchen clevestory window, repair & maintain kitchen bay windowsDetails
remodel (e) kitchern, remodel (e) bathroom, replace bathroom window in kind, replace kitchen clevestory window, repair & maintain kitchen bay windows | $100,000 |
| May 2, 2012 | Completed final sign-off Oct 2012 | 3370 Washington St | remodel of kitchen, master closet, mster bath, 2 new windows, 1 window replaced in kindDetails
remodel of kitchen, master closet, mster bath, 2 new windows, 1 window replaced in kind | $115,000 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 2072 Jackson St | work in unit #2: bathroom renovation - remove drywall and replace, remove fixtures and flooring and replace. no structural work. no (n) lighting.Details
work in unit #2: bathroom renovation - remove drywall and replace, remove fixtures and flooring and replace. no structural work. no (n) lighting. | $11,500 |
| Jan 4, 2012 | Completed final sign-off Mar 2014 | 3494 Jackson St | replace (e) stucco w/wood shingle, & (e) vinyl windows w/wood windows, install insulation in walls & roof, new radiant floor heating system, new kitchen appliances, alter counter in bath.Details
replace (e) stucco w/wood shingle, & (e) vinyl windows w/wood windows, install insulation in walls & roof, new radiant floor heating system, new kitchen appliances, alter counter in bath. | $150,000 |
| Sep 27, 2011 | Completed final sign-off Sep 2012 | 49 Park Hill Av | revision to 201107281272. revise layout to master bedroom, bath. revise mater bath windows to metal single glazed doors. revise atrium and dining room doors to metal/single glasing, revise kitchen so windows to metal single w/wd exterior. move tube steel/beam @ grid 1 to grid 2, add interiorDetails
revision to 201107281272. revise layout to master bedroom, bath. revise mater bath windows to metal single glazed doors. revise atrium and dining room doors to metal/single glasing, revise kitchen so windows to metal single w/wd exterior. move tube steel/beam @ grid 1 to grid 2, add interior | $20,000 |
| Jul 28, 2011 | Completed final sign-off Sep 2012 | 49 Park Hill Av | revision to 201104053532. kitchen windows (so wall) revised, add atrium in existing breakfast area, remove an existing and add a new bath to upper level. revise layout of lower level, enlarge existing bath at lower level. add windows to laundry room.Details
revision to 201104053532. kitchen windows (so wall) revised, add atrium in existing breakfast area, remove an existing and add a new bath to upper level. revise layout of lower level, enlarge existing bath at lower level. add windows to laundry room. | $50,000 |
| Jul 15, 2011 | Completed final sign-off Jun 2012 | 60 Normandie Tr | remodel existing habitable basement and patio, add 1/2 bath and bar. remodel 1st floor corridor and stair. eliminate bathroom. remodel master bedroom suite, eliminate bath and add powder room. removel master bath. add island with prep sink in kitchen.Details
remodel existing habitable basement and patio, add 1/2 bath and bar. remodel 1st floor corridor and stair. eliminate bathroom. remodel master bedroom suite, eliminate bath and add powder room. removel master bath. add island with prep sink in kitchen. | $375,000 |
| Feb 2, 2011 | Completed final sign-off May 2011 | 23 Kronquist Ct | remove rear deck at 2nd floor,replace extg door at rear deck with window, replace extg kitchen window. new window at stair 2. remove extg door from garage. replace finishes in kitchen. no structural. legalize ground floor bath and bedroom.Details
remove rear deck at 2nd floor,replace extg door at rear deck with window, replace extg kitchen window. new window at stair 2. remove extg door from garage. replace finishes in kitchen. no structural. legalize ground floor bath and bedroom. | $105,763 |
| Nov 4, 2010 | Completed final sign-off Sep 2011 | 2106 Jackson St | 8th floor:renovation to extg residential unit kitchen and master bath including. remodel of extg kitchen and master bath. replacement of extg fixutres, finishes, lights and electric. installation of new skylightDetails
8th floor:renovation to extg residential unit kitchen and master bath including. remodel of extg kitchen and master bath. replacement of extg fixutres, finishes, lights and electric. installation of new skylight | $130,000 |
| Mar 30, 2010 | Completed final sign-off Oct 2010 | 1940 Broadway | move walls in living room, new closet in bedroom-3, replace bathtub with shower in bath-3, new soffit in master bathroom. revision to appl.#201003107935.sprinkler revision under separate appl.Details
move walls in living room, new closet in bedroom-3, replace bathtub with shower in bath-3, new soffit in master bathroom. revision to appl.#201003107935.sprinkler revision under separate appl. | $15,000 |
| Jan 19, 2010 | Completed final sign-off Oct 2010 | 5 Cottage Rw | voluntary structural upgrade, replace slab & foundation. remodel of (e) ground floor. relocate laundry room, extend stairs, new bathroom, upgrade heating, windows and insulation.Details
voluntary structural upgrade, replace slab & foundation. remodel of (e) ground floor. relocate laundry room, extend stairs, new bathroom, upgrade heating, windows and insulation. | $40,000 |
| Sep 1, 2009 | Completed final sign-off Feb 2010 | 3680 21st St | ground floor bath - replace in kind w/new fixtures & finishes. no structural changes. provide high efficacy lights on "manual on" occupancy sensor.Details
ground floor bath - replace in kind w/new fixtures & finishes. no structural changes. provide high efficacy lights on "manual on" occupancy sensor. | $9,200 |
| Jul 21, 2009 | Never finaled issued Jul 2009, no final | 3570 Washington St | master bedroom & bathroom renovation in place. minor structural modifications per attached drawings. modify load brg walls & add 2 beams no new square footage. no exterior modifications.Details
master bedroom & bathroom renovation in place. minor structural modifications per attached drawings. modify load brg walls & add 2 beams no new square footage. no exterior modifications. | $85,000 |
| Jun 30, 2009 | Completed final sign-off Mar 2011 | 3445 Washington St | excavate and extend garage. new stair from grg to entry lvl. new hydronic heating throughout. remodel kitch. & add 70 sqft. remodel (e) baths. relocate selected int. partitions on 2nd & 3r flrs. remove 2 (e) chimneys. replace selected wdws. exterior patch of stucco and paintDetails
excavate and extend garage. new stair from grg to entry lvl. new hydronic heating throughout. remodel kitch. & add 70 sqft. remodel (e) baths. relocate selected int. partitions on 2nd & 3r flrs. remove 2 (e) chimneys. replace selected wdws. exterior patch of stucco and paint | $425,000 |
| Jun 5, 2009 | Completed final sign-off Feb 2010 | 3680 21st St | 2nd floor interior remodel only of existing kitchen, bath, hallway & stair refinish.Details
2nd floor interior remodel only of existing kitchen, bath, hallway & stair refinish. | $21,500 |
| Jul 24, 2008 | Completed final sign-off Jan 2010 | 2701 Pacific Av | revision to pa #200805061450 - new roof deck lowering the existing height of the bldg. new residential elevator from garage to roof deck. remodel the existing 4th floor interior & enlarge bathroom. new stair from 4th floor to roof deck. (2) new dormers & enlarge (2) dormers.Details
revision to pa #200805061450 - new roof deck lowering the existing height of the bldg. new residential elevator from garage to roof deck. remodel the existing 4th floor interior & enlarge bathroom. new stair from 4th floor to roof deck. (2) new dormers & enlarge (2) dormers. | $800,000 |
| Jul 9, 2008 | Completed final sign-off Dec 2008 | 2538 Polk St | remodel kitchen & bath. no structural changes. new kitchen lighting to be 50% min high efficacy. new bath lighting to be high efficacy or mannual on auto off.Details
remodel kitchen & bath. no structural changes. new kitchen lighting to be 50% min high efficacy. new bath lighting to be high efficacy or mannual on auto off. | $14,625 |
| Jul 9, 2008 | Completed final sign-off Dec 2008 | 297 Addison St | remodel master bath. no structural work. any new lighting to be high efficiency or manual on auto off.Details
remodel master bath. no structural work. any new lighting to be high efficiency or manual on auto off. | $6,455 |
| Jan 16, 2008 | Completed final sign-off Aug 2008 | 1170 Sacramento St | interior remodel of master suite ( bedroom, dressing and bath) and selective remodel of case work on unit 7d, 7th floor. no exterior work. #7dDetails
interior remodel of master suite ( bedroom, dressing and bath) and selective remodel of case work on unit 7d, 7th floor. no exterior work. #7d | $65,000 |
| Oct 12, 2006 | Completed final sign-off Mar 2007 | 2140 Bush St | interior renovation to (e) unit including kitchen, powder room, laundry room, master bath and fireplace. change bedroom to study, change living room to bedroom/living room. new laundry & powder. consolidate 2 closets to oneDetails
interior renovation to (e) unit including kitchen, powder room, laundry room, master bath and fireplace. change bedroom to study, change living room to bedroom/living room. new laundry & powder. consolidate 2 closets to one | $55,000 |
| Apr 13, 2006 | Expired or cancelled expired Jan 2008 | 421 Tehama St | interior renovation-kchn, bath, interior partitions and master bedroom, hvac, elect, plmg, under sererate permitsDetails
interior renovation-kchn, bath, interior partitions and master bedroom, hvac, elect, plmg, under sererate permits | $180,000 |
| Dec 13, 2005 | Completed final sign-off Apr 2006 | 814 Alvarado St | install bathroom fixtures and finishes in two bathroomsremodeled under separate permit, build 1/2 height wall in bottom floor full height for 2' wide x 8' long, replace (2) windows in front facade with same sized windows #9807337sDetails
install bathroom fixtures and finishes in two bathroomsremodeled under separate permit, build 1/2 height wall in bottom floor full height for 2' wide x 8' long, replace (2) windows in front facade with same sized windows #9807337s | $7,000 |
| Aug 15, 2005 | Completed final sign-off Feb 2007 | 2020 Great Hy | this three story addition ccontains a bedroom, playroom, solarium, two bathrooms, and three exteiorDetails
this three story addition ccontains a bedroom, playroom, solarium, two bathrooms, and three exteior | $400,000 |
| Jul 12, 2005 | Completed final sign-off Oct 2005 | 25 Belgrave Av | rev.to appl#200505122271,1 additional bathroom,change to upstairs hallway,change to stair rail,removDetails
rev.to appl#200505122271,1 additional bathroom,change to upstairs hallway,change to stair rail,remov | $50,000 |
| Jun 29, 2005 | Completed final sign-off Dec 2007 | 1076 South Van Ness Av | vertical addition, new third floor bedroom & bath, new fourth floor studio and roof deck to existing structure.Details
vertical addition, new third floor bedroom & bath, new fourth floor studio and roof deck to existing structure. | $700,000 |
| Mar 15, 2005 | Expired or cancelled expired Dec 2006 | 50 Normandie Tr | demolition of existing kitchen 2nd flr & master bath, replace kitchen cabs, countertops, backsplashDetails
demolition of existing kitchen 2nd flr & master bath, replace kitchen cabs, countertops, backsplash | $40,000 |
| Sep 8, 2004 | Completed final sign-off May 2005 | 2999 Pacific Av | #4-interior remodel of kitchen/master bedroom/bathroom suite.remove 1/f (e)bathroom,closet,1 wall toDetails
#4-interior remodel of kitchen/master bedroom/bathroom suite.remove 1/f (e)bathroom,closet,1 wall to | $100,000 |
| Aug 10, 2004 | Completed final sign-off Nov 2004 | 3030 Pacific Av | remodel 1 bathroom including finishes,electrical & plumbing on 3/f,add electrical @office on 3/f.Details
remodel 1 bathroom including finishes,electrical & plumbing on 3/f,add electrical @office on 3/f. | $20,000 |