Masterful Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Feb 2022 to Aug 2026
- Last 24 months
- 10 permits filed
16 permits since 2000: 8 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 2 in progress. Typically 304 days from filing to permit and 1133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2023 | In progress issued Jan 2024 | 441 Quintara St | new elevator. enclose decksDetails
new elevator. enclose decks | $150,000 |
| Aug 8, 2022 | In progress issued Nov 2023 | 258 12th Av | single family residential interior remodel. two story rear yard addition, and revised back exterior deck.Details
single family residential interior remodel. two story rear yard addition, and revised back exterior deck. | $166,585 |
| Feb 14, 2022 | Completed final sign-off Jan 2026 | 337 Nevada St | exterior improvements on 2-sides of bldg (repair (e) framing, seismic anchors, continuous insulation, overlay of new siding, replace wndws & doors). small addition of int. space & roof deck at rear/side. plumbing for (n) roof drain. (n) elec/light fixtures. (n) spiral stairs. repair/modify (e) deck.Details
exterior improvements on 2-sides of bldg (repair (e) framing, seismic anchors, continuous insulation, overlay of new siding, replace wndws & doors). small addition of int. space & roof deck at rear/side. plumbing for (n) roof drain. (n) elec/light fixtures. (n) spiral stairs. repair/modify (e) deck. | $92,000 |