- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2016 | Completed final sign-off Sep 2016 | 2136 Broderick St | #2 - bath shower valve change, tile work, change fixtures, paint; #9 - bath shower valve change, tile work, change fixtures, paint; #8 - shower valve change, tiel work, change fixtures, paintDetails
#2 - bath shower valve change, tile work, change fixtures, paint; #9 - bath shower valve change, tile work, change fixtures, paint; #8 - shower valve change, tiel work, change fixtures, paint | $27,000 |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 1360 Montgomery St | #1: bath shower valve change, floor and wall tile, fixture change, 3 additional recess lights, paint. no structural work.Details
#1: bath shower valve change, floor and wall tile, fixture change, 3 additional recess lights, paint. no structural work. | $15,000 |
| Feb 2, 2016 | Completed final sign-off Oct 2016 | 2775 Market St | unit #203: bath: shower valve change,tub change,outlet change. kitchen: 220v outlet relocation, additional outlet (4 total) change cabinet same kind unit #203.Details
unit #203: bath: shower valve change,tub change,outlet change. kitchen: 220v outlet relocation, additional outlet (4 total) change cabinet same kind unit #203. | $3,500 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 2136 Broderick St | unit # 20: shower valve change/and upgrades, remodel bath (tile, paint) replace in kind.Details
unit # 20: shower valve change/and upgrades, remodel bath (tile, paint) replace in kind. | $1,000 |
| Oct 26, 2015 | Completed final sign-off Feb 2016 | 2136 Broderick St | unit 7 and unit 14: shower valve change, adding waste line, adding hot/cold water line, 2 outlet (receptacles add on), unit #10 changing shower valve. remodel bathroom units #7, 10, 14.Details
unit 7 and unit 14: shower valve change, adding waste line, adding hot/cold water line, 2 outlet (receptacles add on), unit #10 changing shower valve. remodel bathroom units #7, 10, 14. | $15,000 |