Back to bathroom remodel contractors
Martinez Construction Co.
- Based in
- Oakland
- On San Francisco permits
- Apr 2004 to Aug 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 14 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2011 | Completed final sign-off May 2012 | 300 03rd St | unit 1015: kitchen remodel:new cabinets, appliances, electrical work. 2 bathroom remodels:new sink and cabinets, toilet, new tile electrical work. removal of 2 non load bearing walls. new flooring throughout. fire sprinklers on separate permit after field verification by fire inspector if necessary.Details
unit 1015: kitchen remodel:new cabinets, appliances, electrical work. 2 bathroom remodels:new sink and cabinets, toilet, new tile electrical work. removal of 2 non load bearing walls. new flooring throughout. fire sprinklers on separate permit after field verification by fire inspector if necessary. | $20,000 |