Back to bathroom remodel contractors
Martin Tynan & Son Construction
- Based in
- Burlingame
- On San Francisco permits
- Feb 2000 to Oct 2026
- Last 24 months
- 3 permits filed
38 permits since 2000: 27 completed, 5 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 6 completed, 1 in progress, 3 never finaled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2025 | Completed final sign-off Jul 2025 | 2309 Divisadero St | unit #7 replace in kind 1 kitchen & bath remodel. fixtures, sink & countertop. retile bath shower remove 2 bedroom paneling & re-sheetrock, elec-rewire.Details
unit #7 replace in kind 1 kitchen & bath remodel. fixtures, sink & countertop. retile bath shower remove 2 bedroom paneling & re-sheetrock, elec-rewire. | $20,000 |
| Jan 25, 2022 | Completed final sign-off Aug 2022 | 319 Duncan St | unit #4: remodel in-kind 1 kitchen & 1 bathroom. non-structural.Details
unit #4: remodel in-kind 1 kitchen & 1 bathroom. non-structural. | $50,000 |
| Dec 17, 2021 | In progress issued Dec 2023 | 379 Eureka St | ***priority ab-004 *** 3-story rear horizontal addition maintaining 45% rear yard set back. maintain 3 bedrooms and add 2.25 baths, remodel.Details
***priority ab-004 *** 3-story rear horizontal addition maintaining 45% rear yard set back. maintain 3 bedrooms and add 2.25 baths, remodel. | $450,000 |
| Dec 16, 2021 | Never finaled issued Dec 2021, no final | 550 El Camino Del Mar | replace in kind 2 en suite bathrooms lower floor and one bathroom on 1st floor. remove acoustic ceiling tile in family room and hallway. lower floor and re-sheetrock ceiling. no wall alteration.Details
replace in kind 2 en suite bathrooms lower floor and one bathroom on 1st floor. remove acoustic ceiling tile in family room and hallway. lower floor and re-sheetrock ceiling. no wall alteration. | $50,000 |
| Dec 1, 2021 | Never finaled issued Dec 2021, no final | 550 El Camino Del Mar | replace in kind kitchen remodel and master bath remodel.Details
replace in kind kitchen remodel and master bath remodel. | $50,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 2309 Divisadero St | unit 6: replace in kind one kitchen remodel and one bathroom remodel: fixtures, sink, and countertop. retile bathroom shower. remove bedroom wall panelling and re-sheetrock.Details
unit 6: replace in kind one kitchen remodel and one bathroom remodel: fixtures, sink, and countertop. retile bathroom shower. remove bedroom wall panelling and re-sheetrock. | $10,000 |
| Nov 20, 2020 | Never finaled issued Nov 2020, no final | 1928 Pine St | replace (e) master bath fixtures in kind and re-tileDetails
replace (e) master bath fixtures in kind and re-tile | $5,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2020 | 2309 Divisadero St | unit 4a. replace in-kind, kitchen cabinets, bathroom fixtures, sink & countertop. kitchen 6'x5' and bathroom 6'x5'Details
unit 4a. replace in-kind, kitchen cabinets, bathroom fixtures, sink & countertop. kitchen 6'x5' and bathroom 6'x5' | $2,500 |
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 2215 California St | interior remodel, new windows at rear of building and lightwell, repair/reconstruct exterior walls where damaged at rear. create roof deck at 3rd story connect 2nd story to garage level with new int stair. new bath, kitchen remodel, replace front windows with woodDetails
interior remodel, new windows at rear of building and lightwell, repair/reconstruct exterior walls where damaged at rear. create roof deck at 3rd story connect 2nd story to garage level with new int stair. new bath, kitchen remodel, replace front windows with wood | $280,000 |
| Jul 18, 2011 | Completed final sign-off Mar 2012 | 827 Corbett Av | replace kitchen cabinets and bathroom remodel. 8 units (8 kitchen remodels and 8 bathroom remodels). no windows/doors/walls under this permitDetails
replace kitchen cabinets and bathroom remodel. 8 units (8 kitchen remodels and 8 bathroom remodels). no windows/doors/walls under this permit | $15,000 |