Maron Moses
- Based in
- San Rafael
- On San Francisco permits
- Feb 2003 to May 2023
- Last 24 months
- 0 permits filed
31 permits since 2000: 17 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2016 | Completed final sign-off May 2017 | 1407 Golden Gate Av | repair damaged lath & plaster wall in parlor, remove plaster crown molding & patch w/new sheetrock & crown molding, replace one rear facing window in (e) opening, replace sliding patio door to rear deck with new in (e) opening.Details
repair damaged lath & plaster wall in parlor, remove plaster crown molding & patch w/new sheetrock & crown molding, replace one rear facing window in (e) opening, replace sliding patio door to rear deck with new in (e) opening. | $12,000 |