Back to bathroom remodel contractors
Mark Scott Construction Inc
- Based in
- Pleasant Hill
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 10 permits filed
313 permits since 2000: 249 completed, 10 in progress, 25 never finaled, 29 expired or cancelled.
Of the 25 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
50 bathroom remodel permits: 36 completed, 3 in progress, 7 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | In progress issued Apr 2026 | 1215 Quesada Av | fire damage restoration & legalize g/f improvements including horizontal addition to rear yard: one bedroom w/ bath, utility closet,second-story patio, metal stair and canopy. remove detached rear yard storage (deferred). patch/repair building exterior & finishes damaged in fire, wall, roof, windowDetails
fire damage restoration & legalize g/f improvements including horizontal addition to rear yard: one bedroom w/ bath, utility closet,second-story patio, metal stair and canopy. remove detached rear yard storage (deferred). patch/repair building exterior & finishes damaged in fire, wall, roof, window | $415,824 |
| Aug 22, 2025 | Completed final sign-off Jun 2026 | 3622 22nd St | fire damage repair from incident on july 4. replace damaged floor, drywall, bathroom shower, roof deck, and roofing in kind like for like. plumbing replace in kind like for like as needed. replace in kind as neededminor framing as needed. to fully abate nov 202540574 (no work visible from street)Details
fire damage repair from incident on july 4. replace damaged floor, drywall, bathroom shower, roof deck, and roofing in kind like for like. plumbing replace in kind like for like as needed. replace in kind as neededminor framing as needed. to fully abate nov 202540574 (no work visible from street) | $452,833 |
| Jul 25, 2025 | In progress issued Jul 2025 | 3622 22nd St | exploratory only interior demo at roof deck floor, siding, exterior wall, bathroom, kitchen ceiling and walls and water damage at lower level. nothing street visible or facing. to comply with bid correction notice 202540574Details
exploratory only interior demo at roof deck floor, siding, exterior wall, bathroom, kitchen ceiling and walls and water damage at lower level. nothing street visible or facing. to comply with bid correction notice 202540574 | $35,000 |
| May 3, 2024 | Completed final sign-off Oct 2025 | 724 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| May 3, 2024 | Completed final sign-off Dec 2025 | 726 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| May 3, 2024 | In progress issued Oct 2024 | 724 Masonic Av | repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathroomsDetails
repair fire damage throughout to comply with bid nov# 202316970. replace all finishes fixtures etc at 1 kitchen 2 bathrooms | $100,000 |
| May 11, 2023 | Never finaled issued May 2023, no final | 563 18th Av | lower level/garage level= replace 64 sqft 5/8" drywall - primary bathroom install vanity faucet, install tile at shower walls. like for likeDetails
lower level/garage level= replace 64 sqft 5/8" drywall - primary bathroom install vanity faucet, install tile at shower walls. like for like | $9,500 |
| Nov 2, 2018 | Completed final sign-off Feb 2019 | 2054 Carroll Av | repair fire damage at rear west corner at lower level bathroom, 100 sq ft. (e) siding and patch roof 10 sq ft. remove and replace in-kind no structural framing, replace like for like, in-kindDetails
repair fire damage at rear west corner at lower level bathroom, 100 sq ft. (e) siding and patch roof 10 sq ft. remove and replace in-kind no structural framing, replace like for like, in-kind | $37,500 |
| Jul 19, 2018 | Completed final sign-off Oct 2018 | 501 Beale St | water damage repair outside the bathroom. remove and replace 40' sf drywall and remove and replace engineer wood in 2 bedroom, living room, and dining room.Details
water damage repair outside the bathroom. remove and replace 40' sf drywall and remove and replace engineer wood in 2 bedroom, living room, and dining room. | $15,000 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 2960 Scott St | unit #1: water damage to bathroom: new insulation 73 sq. ft. r-13/ 42 sq. ft r-19. new drywall 221 sq. ft. re-set vanity/ceiling flash mount light; new floor tileDetails
unit #1: water damage to bathroom: new insulation 73 sq. ft. r-13/ 42 sq. ft r-19. new drywall 221 sq. ft. re-set vanity/ceiling flash mount light; new floor tile | $18,000 |
| Nov 10, 2017 | Completed final sign-off Dec 2017 | 3861 25th St | #b- small drywall repair in bathroom from toilet like above in main floor, remove/replace fan light combo, remove and reset vanity. no structural work in this area.Details
#b- small drywall repair in bathroom from toilet like above in main floor, remove/replace fan light combo, remove and reset vanity. no structural work in this area. | $1,600 |
| Sep 27, 2017 | Completed final sign-off Aug 2018 | 2667 16th Av | remodel of e bathroom, remove non bearing interior partitions, new non bearing int partitions, remove and replace plumbing fixtures, provide new 1/2 bath w toielet and lavatory. also to address minor fire damage (smoke) at garage and batrhroom.Details
remodel of e bathroom, remove non bearing interior partitions, new non bearing int partitions, remove and replace plumbing fixtures, provide new 1/2 bath w toielet and lavatory. also to address minor fire damage (smoke) at garage and batrhroom. | $10,000 |
| Aug 14, 2017 | Completed final sign-off Oct 2017 | 676 Clipper St | drywall/floor repair in master bedroom area, due to a water leak from vanity sink, no structural work to be cone, remove/replace vanity sink in bathroom.Details
drywall/floor repair in master bedroom area, due to a water leak from vanity sink, no structural work to be cone, remove/replace vanity sink in bathroom. | $7,500 |
| May 17, 2017 | Completed final sign-off May 2017 | 3670 17th St | drywall repair in stairs area in unit 3670. also drywall repair in kitchen area in unit 3674. no structural damage. damge caused by water leak from upstairs bathroomDetails
drywall repair in stairs area in unit 3670. also drywall repair in kitchen area in unit 3674. no structural damage. damge caused by water leak from upstairs bathroom | $3,000 |
| Mar 29, 2017 | Completed final sign-off Jan 2018 | 818 Greenwich St | unit 818a: kitchen & bath remodel, replace (2) windows not visible from street, replace sheetrock, light fixtures, plumbing fixtures damaged by fire.Details
unit 818a: kitchen & bath remodel, replace (2) windows not visible from street, replace sheetrock, light fixtures, plumbing fixtures damaged by fire. | $55,000 |
| Feb 3, 2017 | Completed final sign-off Mar 2017 | 420 Mission Bay Blvd North Bl | unit 703: drywall & carpet replacement, small drywall patch in bathroom caused by leak in unit 1601.Details
unit 703: drywall & carpet replacement, small drywall patch in bathroom caused by leak in unit 1601. | $1,500 |
| Aug 2, 2016 | Completed final sign-off Jul 2017 | 1715 24th Av | there was a leak in the upstairs ceiling. we need to repair the electrical in the 3 bathrooms. change shower mixer valves and angel stops. repair damaged sheetrock. there will be new tile in the shower wallsDetails
there was a leak in the upstairs ceiling. we need to repair the electrical in the 3 bathrooms. change shower mixer valves and angel stops. repair damaged sheetrock. there will be new tile in the shower walls | $24,000 |
| Jul 13, 2016 | Completed final sign-off Aug 2016 | 1 Daniel Burnham Ct | apt 1116: water damage repair. drywall repair in bathroom, laundry room and hallway. living room remove and replace capret in hallway.Details
apt 1116: water damage repair. drywall repair in bathroom, laundry room and hallway. living room remove and replace capret in hallway. | $8,000 |
| May 5, 2016 | Never finaled issued May 2016, no final | 435 China Basin St | water damage reair from the unit above. small drywall repair in bathroom, hollway, closet, & flooring. replacement in kind and painting.Details
water damage reair from the unit above. small drywall repair in bathroom, hollway, closet, & flooring. replacement in kind and painting. | $14,000 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 435 China Basin St | water damage reair from the toilet in bathroom. small drywall repair in bathroom, hollway, closet, & livingroom. no structural work in the unit.Details
water damage reair from the toilet in bathroom. small drywall repair in bathroom, hollway, closet, & livingroom. no structural work in the unit. | $16,000 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 435 China Basin St | unit #327: water damage reair from the unit above. small drywall repair in bathroom, hollway, & flooring and painting. no structural work in the unitDetails
unit #327: water damage reair from the unit above. small drywall repair in bathroom, hollway, & flooring and painting. no structural work in the unit | $14,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 420 Mission Bay Blvd North Bl | water damage rapair insulation drywall no floring, bathroom living room , kitchen , entry hall no structural work .Details
water damage rapair insulation drywall no floring, bathroom living room , kitchen , entry hall no structural work . | $15,750 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 420 Mission Bay Blvd North Bl | water damage rapair insulation drywall no floring, bathroom living room , kitchen , entry hall no structural work .Details
water damage rapair insulation drywall no floring, bathroom living room , kitchen , entry hall no structural work . | $15,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 420 Mission Bay Blvd North Bl | water damage repair in kitchen, bathroom, living room & hallway; remove & reset upper cabinets, insulation & drawall only, no structural work. compliance with maher ordinance no 155-13 not required.Details
water damage repair in kitchen, bathroom, living room & hallway; remove & reset upper cabinets, insulation & drawall only, no structural work. compliance with maher ordinance no 155-13 not required. | $16,250 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 420 Mission Bay Blvd North Bl | water damage rapair insulation drywall no floring, bedroom ,bathroom living room , kitchen , drywall & insulation only.entry hall no structural work .Details
water damage rapair insulation drywall no floring, bedroom ,bathroom living room , kitchen , drywall & insulation only.entry hall no structural work . | $17,500 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 420 Mission Bay Blvd North Bl | water damage repair in bathroom linen closet, bedroom entry hallway; insulation & drawall only, no structural work, 5/8" "x". compliance with maher ordinance no 155-13 not required.Details
water damage repair in bathroom linen closet, bedroom entry hallway; insulation & drawall only, no structural work, 5/8" "x". compliance with maher ordinance no 155-13 not required. | $17,875 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 501 Beale St | 22nd flr: penthouse #1- remodel for disabled access: lower countertops in kitchen, modify cabinets, add motorized blinds. bathroom - roll in shower, new vanity, enlarge laundry for s/s w/d. maher naDetails
22nd flr: penthouse #1- remodel for disabled access: lower countertops in kitchen, modify cabinets, add motorized blinds. bathroom - roll in shower, new vanity, enlarge laundry for s/s w/d. maher na | $73,000 |
| Apr 10, 2015 | Completed final sign-off Apr 2016 | 2314 36th Av | fire reconstruction. comply with nov 201415132. complete inteior demo to bare stud walls and ceilings. structural reframe a part of roof. replace in like kind.repair damage sidewalk,remove batht tub & repl with shower at bath 2nd flr.Details
fire reconstruction. comply with nov 201415132. complete inteior demo to bare stud walls and ceilings. structural reframe a part of roof. replace in like kind.repair damage sidewalk,remove batht tub & repl with shower at bath 2nd flr. | $295,000 |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 2622 Mission St | money transfer unit, water damage from fire next door, remove & replace insulation 2' drywall in 2 bathrooms, remove & reset, toilets, sinks handicap grab bars, soap dispenser and seat cover dis.Details
money transfer unit, water damage from fire next door, remove & replace insulation 2' drywall in 2 bathrooms, remove & reset, toilets, sinks handicap grab bars, soap dispenser and seat cover dis. | $15,873 |
| Jun 9, 2014 | Completed final sign-off Aug 2014 | 222 Ewing Tr | drywall repair & re-attcing (e) bathroom vanities, & toilets from water damageDetails
drywall repair & re-attcing (e) bathroom vanities, & toilets from water damage | $5,000 |
| Mar 14, 2014 | Completed final sign-off Apr 2014 | 851 Van Ness Av | bathroom remodel no structural work required. re-installation of tub & valves. laminate flooring to be replaced throughout. install new tile @ bathroom fl & shower walls.Details
bathroom remodel no structural work required. re-installation of tub & valves. laminate flooring to be replaced throughout. install new tile @ bathroom fl & shower walls. | $23,000 |
| Nov 4, 2013 | Completed final sign-off Jun 2014 | 468 42nd Av | new electrical including new main power electrical, kitchen remodel. new heater installation. bathroom remodel and interior remodel at 2nd and 3rd floor. plmg 1" water line up grade from street to house. minor framing repair. all work due to waterloss.Details
new electrical including new main power electrical, kitchen remodel. new heater installation. bathroom remodel and interior remodel at 2nd and 3rd floor. plmg 1" water line up grade from street to house. minor framing repair. all work due to waterloss. | $115,000 |
| Sep 25, 2013 | Expired or cancelled suspend Jan 2015 | 214 States St | replace (2) bath tubs, (2) surroundds and (2) vanities in (2) existing bathrooms. partial compliance for bathroom remodel on nov # 201391903.Details
replace (2) bath tubs, (2) surroundds and (2) vanities in (2) existing bathrooms. partial compliance for bathroom remodel on nov # 201391903. | $9,000 |
| Jun 11, 2013 | Completed final sign-off Jul 2013 | 55 Page St | #312 - repair sheetrock where damaged by water overflow, repair tile where removed to repair sheetrock at bathroom, bedroom, dining & hallway, repaint.Details
#312 - repair sheetrock where damaged by water overflow, repair tile where removed to repair sheetrock at bathroom, bedroom, dining & hallway, repaint. | $6,637 |
| Apr 2, 2013 | Completed final sign-off May 2013 | 1405 25th Av | bath room, dry rot and water damage repair. like for like. 1.28gal toilet. no plans.Details
bath room, dry rot and water damage repair. like for like. 1.28gal toilet. no plans. | $14,251 |
| Mar 12, 2013 | Never finaled issued Mar 2013, no final | 4441 Balboa St | restore 2 apartment units to pre-fire condition. replace 2 top plates in lower bath. replace finishes in lower & upper bath & hallway. to include insulation, sheetrock tile, lino. vanity, sink, etc. electrical to be redone; in areas where sheetrock was removed. plumbing to be redone as needed. likeDetails
restore 2 apartment units to pre-fire condition. replace 2 top plates in lower bath. replace finishes in lower & upper bath & hallway. to include insulation, sheetrock tile, lino. vanity, sink, etc. electrical to be redone; in areas where sheetrock was removed. plumbing to be redone as needed. like | $62,176 |
| Nov 15, 2012 | Completed final sign-off Jan 2013 | 1405 25th Av | remove and replace dry rot and complete bathroom; install new ceramic tile floor and showerDetails
remove and replace dry rot and complete bathroom; install new ceramic tile floor and shower | $9,443 |
| Mar 22, 2012 | Completed final sign-off Dec 2012 | 1334 Hayes St | comply with nov 201147666 and 201147747: fire damage repair of rear living space. rebuild to prefire condition (exterior) redesign bathroom closet area remodel. exterior staircase repair.Details
comply with nov 201147666 and 201147747: fire damage repair of rear living space. rebuild to prefire condition (exterior) redesign bathroom closet area remodel. exterior staircase repair. | $250,000 |
| Jul 30, 2010 | Expired or cancelled expired Jan 2012 | 886 Broadway | #886 & #888- sheetrock damage due to water in bathrooms, replace sheetrock in both approx. 300 sq.ft.. unit #1512 & #1514 - water damage of sheetrock in hallway of both & damage of sheet rock in 2 bedrooms of each unit, replace approx 900 sq.ft. of sheetrock in both units.Details
#886 & #888- sheetrock damage due to water in bathrooms, replace sheetrock in both approx. 300 sq.ft.. unit #1512 & #1514 - water damage of sheetrock in hallway of both & damage of sheet rock in 2 bedrooms of each unit, replace approx 900 sq.ft. of sheetrock in both units. | $11,500 |
| Jun 28, 2010 | Expired or cancelled expired Aug 2013 | 2539 44th Av | water damage to bathroom area. replace drywall (80 sf) tile of surround of bath tub shower area and floor of bathroom.Details
water damage to bathroom area. replace drywall (80 sf) tile of surround of bath tub shower area and floor of bathroom. | $14,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 2539 44th Av | water damage to bath and hall area. sheet rock work to both areas approx. 250 sqft. tile surround of tube. shower combo and tile floor in bath area. painting and floor covering in ither areas. work on 2nd floor.Details
water damage to bath and hall area. sheet rock work to both areas approx. 250 sqft. tile surround of tube. shower combo and tile floor in bath area. painting and floor covering in ither areas. work on 2nd floor. | $14,000 |
| May 14, 2010 | Completed final sign-off Jan 2011 | 569 Lakeview Av | repair fire damage to wall & roof areas. add 2nd. bathroom, reuse & redo plumbing to (e) house. sheetrock entire house and (n) flooring. redo entry area to bring up to code. change out 2-windows on property line to fire rated to comply with code. move one window to comply to code.Details
repair fire damage to wall & roof areas. add 2nd. bathroom, reuse & redo plumbing to (e) house. sheetrock entire house and (n) flooring. redo entry area to bring up to code. change out 2-windows on property line to fire rated to comply with code. move one window to comply to code. | $95,000 |
| Mar 3, 2010 | Never finaled issued Mar 2010, no final | 1322 21st Av | repl kitchen sheetrock approx 550 sq.ft. kitchen cabinets, repl tile in 2 bathrooms (flooring), replace 300 sq.ft. of sheetrock in lower room ceilingDetails
repl kitchen sheetrock approx 550 sq.ft. kitchen cabinets, repl tile in 2 bathrooms (flooring), replace 300 sq.ft. of sheetrock in lower room ceiling | $45,000 |
| Feb 10, 2010 | Completed final sign-off Jul 2010 | 662 Green St | rear bldg. revision to pa# 2009.09.30.7971. reframe of bath, kitchen, lv rm on all three units.rebuild exterior rear stair. replace rear windows from wood to vinylDetails
rear bldg. revision to pa# 2009.09.30.7971. reframe of bath, kitchen, lv rm on all three units.rebuild exterior rear stair. replace rear windows from wood to vinyl | $70,000 |
| Aug 19, 2009 | Completed final sign-off Mar 2010 | 2265 Revere Av | to comply with n.o.v.# 200906701. rebuild entire roof structure due to fire damage-rebuild interior walls for office & 2-bathrooms-front wall (exterior) to accomodate new ada entrance. no change to modify height of building.Details
to comply with n.o.v.# 200906701. rebuild entire roof structure due to fire damage-rebuild interior walls for office & 2-bathrooms-front wall (exterior) to accomodate new ada entrance. no change to modify height of building. | $328,000 |
| Sep 26, 2008 | Expired or cancelled expired Feb 2010 | 270 Bright St | repair fire damage. minor framing damage.replace 5 studs +/- sister to exist floor joist&ceiling joist 10 each.damage to 30% structure-new sheetrock to damage area.new bath fixtures&new kitchen cabinets & appliances. stret facing structure. no structural work.Details
repair fire damage. minor framing damage.replace 5 studs +/- sister to exist floor joist&ceiling joist 10 each.damage to 30% structure-new sheetrock to damage area.new bath fixtures&new kitchen cabinets & appliances. stret facing structure. no structural work. | $130,000 |
| Sep 5, 2008 | Completed final sign-off Apr 2009 | 274 Bright St | remove and replace all chared wall and roof framing, install new romax wiring, bath fixtures, kitchen cabinets and appliances. new sheetrock, insulation and flooring. 3 windows to match (e).Details
remove and replace all chared wall and roof framing, install new romax wiring, bath fixtures, kitchen cabinets and appliances. new sheetrock, insulation and flooring. 3 windows to match (e). | $120,000 |
| Mar 12, 2003 | Completed final sign-off Apr 2003 | 2601 Mason St | redo bathrooms in units 319 and 325 for ada complianceDetails
redo bathrooms in units 319 and 325 for ada compliance | $60,000 |
| Feb 6, 2003 | Completed final sign-off Aug 2003 | 40 Lobos St | fire & smoke damage to drywall, doors, windows&bathroom tile.no structural framing.damage in 1 room,Details
fire & smoke damage to drywall, doors, windows&bathroom tile.no structural framing.damage in 1 room, | $20,000 |
| Jun 18, 2001 | Completed final sign-off Dec 2001 | 200 Laurel St | remodel of master bath & upstairs bath/toilet rm & bathrmDetails
remodel of master bath & upstairs bath/toilet rm & bathrm | $76,468 |