Marinai Construction
- Based in
- Hayward
- On San Francisco permits
- Dec 2009 to Apr 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2010 | Never finaled issued Apr 2010, no final | 207 Amazon Av | remove existing window replace it with new smaller window. not visible from street. in the back of the house. at kitchen area.Details
remove existing window replace it with new smaller window. not visible from street. in the back of the house. at kitchen area. | $1,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2011 | 207 Amazon Av | remove all (e) appliances, countertops, casework & finishes at (e) kitchen. provide all new appliances, countertops, casework, lighting, venting & finishes. no structural work requiredDetails
remove all (e) appliances, countertops, casework & finishes at (e) kitchen. provide all new appliances, countertops, casework, lighting, venting & finishes. no structural work required | $78,500 |