Marin Kitchen Works Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2004 to Dec 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2010 | Completed final sign-off Mar 2011 | 1582 17th Av | bath remodel: remove (e) tile, tub, toilet, cab. install new shower, toilet, cab, counter, fan, floor, paint, two recessed lights, new 20 amp circuit. high efficacy lighting or occupancy sensor control. lighting to comply with cec 150(k). no change to wall, windows or doors.Details
bath remodel: remove (e) tile, tub, toilet, cab. install new shower, toilet, cab, counter, fan, floor, paint, two recessed lights, new 20 amp circuit. high efficacy lighting or occupancy sensor control. lighting to comply with cec 150(k). no change to wall, windows or doors. | $15,000 |
| Dec 16, 2004 | Completed final sign-off Aug 2005 | 1582 17th Av | kitchen remodel: new furnace, counter cabinets, one relocate window (atrium middle of house)Details
kitchen remodel: new furnace, counter cabinets, one relocate window (atrium middle of house) | $30,000 |