Marcos Construction
- Based in
- Redding
- On San Francisco permits
- Nov 2007 to Dec 2009
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 416 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2009 | Completed final sign-off Jun 2010 | 2241 Chestnut St | remove & replace approx. 6-steps on bottom level back exterior stairs. (2241,2243,2245) remove & replace toilet in hallway bathroom (2243). remove and replace 3-old fuse panel & install separate panel for common area.Details
remove & replace approx. 6-steps on bottom level back exterior stairs. (2241,2243,2245) remove & replace toilet in hallway bathroom (2243). remove and replace 3-old fuse panel & install separate panel for common area. | $3,000 |
| Nov 20, 2007 | Never finaled issued Mar 2010, no final | 1970 47th Av | family room addition on 1st floor. legalize remodel garage bath & study room addition on 1st floor.Details
family room addition on 1st floor. legalize remodel garage bath & study room addition on 1st floor. | $20,000 |