Back to bathroom remodel contractors
Manor Window Llc
- Based in
- San Leandro
- On San Francisco permits
- Nov 2020 to Sep 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 6 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2024 | Completed final sign-off Aug 2025 | 150 Cresta Vista Dr | install 2- patio doors 96"x80", 7 various sizes bedroom, kitchen, bathroom windows , 2 of the bedroom windows meet eggress, safety glass used where required (facing frontage)Details
install 2- patio doors 96"x80", 7 various sizes bedroom, kitchen, bathroom windows , 2 of the bedroom windows meet eggress, safety glass used where required (facing frontage) | $11,200 |
| Nov 17, 2020 | Completed final sign-off Dec 2020 | 537 Steiner St | not street visible: furnish install 2- 18x24 0 fixed. 4- 33x68 double hung (no bedrooms)(tempered in bathrooms. all wood clad, title 24 compliant, no framing alterations.Details
not street visible: furnish install 2- 18x24 0 fixed. 4- 33x68 double hung (no bedrooms)(tempered in bathrooms. all wood clad, title 24 compliant, no framing alterations. | $13,600 |