Back to bathroom remodel contractors
Mallard Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Sep 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 25 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 5 days from filing to permit and 801 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2020 | Completed final sign-off Aug 2022 | 1559 26th Av | renovate kitchen with new cabinets, countertops, and lighting. renovate main floor bathroom. replace vanity, toilet, shower door, and lighting. all work will be in kind, same location, same size.Details
renovate kitchen with new cabinets, countertops, and lighting. renovate main floor bathroom. replace vanity, toilet, shower door, and lighting. all work will be in kind, same location, same size. | $23,000 |