Permit GraphShortlistSan Francisco building permits since 2000

Makai Solutions

Contractor license
1017600
State license record
Based in
Gardena
On San Francisco permits
Jun 2017 to Nov 2020
Last 24 months
0 permits filed

4 permits since 2000: 4 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Nov 4, 2020Completed
final sign-off Apr 2021
901 Presidio Avrevision to existing structural drawings s-02,s-02 for existing pa# 2017-0822-5568. structural drawings specific to designed lift foundations submitted to replace s-02,s-04. engineered drawings s1.0,s2.0,s3.0 constitutes the revision.
Details
Permit
202011048135
Status
complete
Filed
Nov 4, 2020
Permit issued
Feb 10, 2021
Final sign-off
Apr 16, 2021
Address
901 Presidio Av

revision to existing structural drawings s-02,s-02 for existing pa# 2017-0822-5568. structural drawings specific to designed lift foundations submitted to replace s-02,s-04. engineered drawings s1.0,s2.0,s3.0 constitutes the revision.

Open the permit page

Sep 15, 2017Completed
final sign-off May 2019
1301 Cesar Chavez Streplace underground diesel piping in kind. remove section of and replumb above ground diesel pipe. yes for maher ordinance.
Details
Permit
201709158476
Status
complete
Filed
Sep 15, 2017
Permit issued
Sep 27, 2018
Final sign-off
May 21, 2019
Declared cost
$200,000
Address
1301 Cesar Chavez St

replace underground diesel piping in kind. remove section of and replumb above ground diesel pipe. yes for maher ordinance.

Open the permit page

$200,000
Aug 22, 2017Completed
final sign-off Apr 2021
901 Presidio Avreplacement of overhead rollup doors, replacement of bus lifts, replacement of swing gates
Details
Permit
201708225568
Status
complete
Filed
Aug 22, 2017
Permit issued
Jan 9, 2020
Final sign-off
Apr 16, 2021
Declared cost
$2,500,000
Address
901 Presidio Av

replacement of overhead rollup doors, replacement of bus lifts, replacement of swing gates

Open the permit page

$2,500,000
Jun 7, 2017Completed
final sign-off Sep 2018
1301 Cesar Chavez Stinstall (4) underground oil tanks, install (2) above ground oil/coolant tanks.
Details
Permit
201706078698
Status
complete
Filed
Jun 7, 2017
Permit issued
Oct 18, 2017
Final sign-off
Sep 4, 2018
Declared cost
$160,000
Address
1301 Cesar Chavez St

install (4) underground oil tanks, install (2) above ground oil/coolant tanks.

Open the permit page

$160,000