Back to bathroom remodel contractors
Mak's Builder
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Apr 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2024 | Completed final sign-off Aug 2024 | 755 43rd Av | remodel kitchen by replace kitchen cabinets and install new appliances. convert existing bath tub to walk-in shower. (1) refurnish bathroom . replace 7 winodws with vinyl on existing opening in the back of the house. add a subpanel and upgrade main panel to 200amp.fenestration max u-factor = 0.30..Details
remodel kitchen by replace kitchen cabinets and install new appliances. convert existing bath tub to walk-in shower. (1) refurnish bathroom . replace 7 winodws with vinyl on existing opening in the back of the house. add a subpanel and upgrade main panel to 200amp.fenestration max u-factor = 0.30.. | $67,500 |