Back to bathroom remodel contractors
Main Gold Constuction Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Jun 2011
- Last 24 months
- 0 permits filed
14 permits since 2000: 10 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2011 | Completed final sign-off Aug 2011 | 195 25th Av | remodel 2 existing bathrooms, install tile on wall and floor. replace new vanity and sink, shower doorsDetails
remodel 2 existing bathrooms, install tile on wall and floor. replace new vanity and sink, shower doors | $12,000 |
| Feb 2, 2006 | Never finaled issued Feb 2006, no final | 1111 Jones St | clear complaint #200565592 replace 1 rear window,repair outside siding, stair, step. bathroom threshold and door hardware.replace window in kind or better.Details
clear complaint #200565592 replace 1 rear window,repair outside siding, stair, step. bathroom threshold and door hardware.replace window in kind or better. | $1,500 |
| Mar 10, 2005 | Completed final sign-off Apr 2005 | 2947 Clement St | bathroom remodel: install shower pan. shower door, toilet vanity and sink tile floor. (first floor).Details
bathroom remodel: install shower pan. shower door, toilet vanity and sink tile floor. (first floor). | $2,000 |
| Jan 11, 2005 | Completed final sign-off Apr 2005 | 2947 Clement St | bathroom repair. remove 1 piece of sheetrock. replace new sheetrock on wall. install new tile on floDetails
bathroom repair. remove 1 piece of sheetrock. replace new sheetrock on wall. install new tile on flo | $500 |
| Dec 5, 2003 | Completed final sign-off May 2004 | 2318 45th Av | remodel 2 bathrooms & 1 kitchen:bathtub,sink toilet,shower,exhault fan & gfi,counter, cabinets,sink.Details
remodel 2 bathrooms & 1 kitchen:bathtub,sink toilet,shower,exhault fan & gfi,counter, cabinets,sink. | $15,000 |