Back to bathroom remodel contractors
Maggetti Construction Inc
- Based in
- San Jose
- On San Francisco permits
- Apr 2016 to Mar 2023
- Last 24 months
- 0 permits filed
7 permits since 2000: 2 completed, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 never finaled. Typically 155 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2020 | Never finaled issued Oct 2020, no final | 640 Davis St | unit #22: (4th floor) install new pocket door. relocate door at master bedroom/bath. remodel kitchen. remodel bath. remove and replace flooring. plumbing & electrical work. new 36" gate at garbage closet.Details
unit #22: (4th floor) install new pocket door. relocate door at master bedroom/bath. remodel kitchen. remodel bath. remove and replace flooring. plumbing & electrical work. new 36" gate at garbage closet. | $65,000 |
| Apr 28, 2017 | Never finaled issued May 2017, no final | 640 Davis St | unit 18, electrical work in bedroom, bathrooms, kitchen, & living room. reference 2017.04.20.5261 n/a for maherDetails
unit 18, electrical work in bedroom, bathrooms, kitchen, & living room. reference 2017.04.20.5261 n/a for maher | $5,000 |
| Apr 20, 2016 | Never finaled issued Sep 2016, no final | 640 Davis St | unit #18 - replace extg brick bay window with new sunroom window, replace 3 extg windows, remodel extg kitchen, remodel 2 bathrooms, replace extg fan and water heater. n/a ordinance #155-13Details
unit #18 - replace extg brick bay window with new sunroom window, replace 3 extg windows, remodel extg kitchen, remodel 2 bathrooms, replace extg fan and water heater. n/a ordinance #155-13 | $65,000 |