Back to bathroom remodel contractors
Macken Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jul 2026
- Last 24 months
- 15 permits filed
154 permits since 2000: 65 completed, 20 in progress, 26 never finaled, 43 expired or cancelled.
Of the 26 never-finaled permits, 8 are 3 to 5 years old, 9 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 11 completed, 8 in progress, 3 never finaled, 12 expired or cancelled. Typically 0 days from filing to permit and 624 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2026 | In progress issued Jun 2026 | 126 Wawona St | 1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind.Details
1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind. | $67,171 |
| Aug 17, 2025 | In progress issued Aug 2025 | 41 Park St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in basement, 1st fl with 2 shower pan(s). | $5,000 |
| Aug 17, 2025 | In progress issued Aug 2025 | 1431 06th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $500 |
| Mar 17, 2025 | In progress issued Mar 2025 | 1954 43rd Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $15,000 |
| Sep 24, 2024 | In progress issued Sep 2024 | 1743 10th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s). | $7,000 |
| Aug 19, 2024 | In progress issued Aug 2024 | 1743 10th Av | revision to pa#: 202404129876. infill south wall lightwell at 3rd floor against neighor's blind wall. add skylight to 3rd flr bath. remove master bath windows.Details
revision to pa#: 202404129876. infill south wall lightwell at 3rd floor against neighor's blind wall. add skylight to 3rd flr bath. remove master bath windows. | $10,000 |
| Apr 12, 2024 | In progress issued Apr 2024 | 1743 10th Av | interior remodel of (e) sfh. 3rd fl - convert (e) reading room to master bath & closet. bath remodel; 2nd fl - bathroom remodel & create new pantry; 1st floor (n) slab on grade @ rear storage roomDetails
interior remodel of (e) sfh. 3rd fl - convert (e) reading room to master bath & closet. bath remodel; 2nd fl - bathroom remodel & create new pantry; 1st floor (n) slab on grade @ rear storage room | $60,000 |
| Dec 13, 2023 | In progress issued Aug 2024 | 41 Park St | 1st fl horizontal addition per planning code section 136, int remodel & infill 2 blind lightwells. 1st fl 60sqft horiz. addition, convert (e) flex space & storage space to master bedroom, bath remodel. 2nd fl infill blind lightwells at east & west sides, new stairs, new deck over 1st floor additionDetails
1st fl horizontal addition per planning code section 136, int remodel & infill 2 blind lightwells. 1st fl 60sqft horiz. addition, convert (e) flex space & storage space to master bedroom, bath remodel. 2nd fl infill blind lightwells at east & west sides, new stairs, new deck over 1st floor addition | $150,000 |
| May 10, 2023 | Expired or cancelled expired Sep 2025 | 1431 06th Av | 3/f: master bath and closet remodel within envelope. reconfigure rear sliding door to new swing door and casement window. no work to front facade. structural work. ref permits 202205244845 and 202208291443.Details
3/f: master bath and closet remodel within envelope. reconfigure rear sliding door to new swing door and casement window. no work to front facade. structural work. ref permits 202205244845 and 202208291443. | $21,000 |
| Mar 23, 2023 | Never finaled issued Mar 2023, no final | 155 Cerritos Av | kitchen and bath renovationDetails
kitchen and bath renovation | $108,000 |
| Jan 30, 2023 | Expired or cancelled expired Jun 2025 | 731 Noe St | 1/f: rehabilitate (e) bedroonm, (e) bath & (e) laundry, install new skylight above (e) stairs. new sliding door at front patio. to comply w/bid nov#202184279Details
1/f: rehabilitate (e) bedroonm, (e) bath & (e) laundry, install new skylight above (e) stairs. new sliding door at front patio. to comply w/bid nov#202184279 | $75,000 |
| Nov 8, 2022 | Never finaled issued Nov 2022, no final | 24 Romain St | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $1,200 |
| Aug 29, 2022 | Expired or cancelled expired Sep 2025 | 1431 06th Av | partial lightwell infill against neighbors blind wall northside. conditioned space behind garage.widen garae door. replace front door and swing door at garage. replace furnace and wtr htr. new heat pump for 3rd story with condenser on roof.new full bath gr level.1 new workshop, 1 new utility/flowerDetails
partial lightwell infill against neighbors blind wall northside. conditioned space behind garage.widen garae door. replace front door and swing door at garage. replace furnace and wtr htr. new heat pump for 3rd story with condenser on roof.new full bath gr level.1 new workshop, 1 new utility/flower | $75,000 |
| Jun 29, 2022 | Completed final sign-off Sep 2025 | 1431 06th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $1,200 |
| May 24, 2022 | Expired or cancelled expired Sep 2025 | 1431 06th Av | no work to front facade. lightwell infill against neighbors blind wall @ south side for addition to top story hall bath to be remodeled. relocate 3rd story laundry; remove fireplace flue @ master bed (3rd fl) & cap flue @ (e) 2nd level dining room fireplace. new roof on infillDetails
no work to front facade. lightwell infill against neighbors blind wall @ south side for addition to top story hall bath to be remodeled. relocate 3rd story laundry; remove fireplace flue @ master bed (3rd fl) & cap flue @ (e) 2nd level dining room fireplace. new roof on infill | $25,000 |
| Sep 27, 2019 | Completed final sign-off Mar 2022 | 990 Green St | unit # 1: interior remodel of (e) condio - new bathrooms, new kitchen, new lighting, new plumbing fixtures and appliances. selected demoltion.(unit at green st, street level)Details
unit # 1: interior remodel of (e) condio - new bathrooms, new kitchen, new lighting, new plumbing fixtures and appliances. selected demoltion.(unit at green st, street level) | $400,000 |
| Aug 23, 2018 | Expired or cancelled expired Jan 2022 | 1025 Sanchez St | interior remodel of 2nd & 3rd residential flrs. (4 units total) remodel (2) bathrooms & (2) kitchens and add (2) bathrooms on each floor.Details
interior remodel of 2nd & 3rd residential flrs. (4 units total) remodel (2) bathrooms & (2) kitchens and add (2) bathrooms on each floor. | $109,000 |
| May 9, 2018 | Never finaled issued May 2018, no final | 1025 Sanchez St | kitchen & bathroom remodel at (3) ttl units (2) at second flooor and (1) at third floor , new electrical & plumbing work at 3 units .Details
kitchen & bathroom remodel at (3) ttl units (2) at second flooor and (1) at third floor , new electrical & plumbing work at 3 units . | $60,000 |
| Jan 29, 2018 | Completed final sign-off Mar 2019 | 220 Santa Paula Av | raise portion of existing main roof approx 9" to allow more head height in master bathroom. renovate masterbath, new windows at master bath. enclose master bedroom roofdeck convert to living space.Details
raise portion of existing main roof approx 9" to allow more head height in master bathroom. renovate masterbath, new windows at master bath. enclose master bedroom roofdeck convert to living space. | $26,560 |
| Apr 8, 2016 | Completed final sign-off Aug 2023 | 2345 Hyde St | kitchen remodel, master bedroom & bathroom. remodel, replace (e) windows & doors in kind. w/(n) double glazed windows. remodel kitchen.Details
kitchen remodel, master bedroom & bathroom. remodel, replace (e) windows & doors in kind. w/(n) double glazed windows. remodel kitchen. | $80,000 |
| Jul 11, 2013 | Expired or cancelled expired May 2024 | 1915 Washington St | demo (e) non bearing walls & supports at 1st floor to add approx 56sq ft of living space. create family room, remodel & legalize (e) bathroom at 1st floor.Details
demo (e) non bearing walls & supports at 1st floor to add approx 56sq ft of living space. create family room, remodel & legalize (e) bathroom at 1st floor. | $20,000 |
| Feb 8, 2013 | Completed final sign-off Nov 2014 | 320 Judah St | revision to pa# 2012/11/30/5202. additional foundation work at basement to expand basement. (e) kitchen & bathroom remodel at 3rd floor. mep,fire sprinkler under separate. facade permit under pa#201302281236.Details
revision to pa# 2012/11/30/5202. additional foundation work at basement to expand basement. (e) kitchen & bathroom remodel at 3rd floor. mep,fire sprinkler under separate. facade permit under pa#201302281236. | $48,000 |
| Nov 30, 2012 | Completed final sign-off Nov 2014 | 320 Judah St | structural repairs to building and foundation improvements, addition of (n) ada bathroom @ ground & second floor. infill windows @ property line & rear (9 windows), demo partition walls, new ada door operator button.Details
structural repairs to building and foundation improvements, addition of (n) ada bathroom @ ground & second floor. infill windows @ property line & rear (9 windows), demo partition walls, new ada door operator button. | $80,000 |
| May 13, 2010 | Completed final sign-off Jul 2010 | 2121 Taylor St | unit #4-new kitchen cabinets, new 1000 sq ft of hardwood floor, new 45 sq ft of tile in bathroomDetails
unit #4-new kitchen cabinets, new 1000 sq ft of hardwood floor, new 45 sq ft of tile in bathroom | $20,000 |
| Dec 29, 2009 | Completed final sign-off Oct 2018 | 40 Dorchester Wy | kitchen & bath remodeling, remove non-structural wall. convert partial crawl space to bedroom & new bath @ ground floor. some structural work on 2nd floor under bpa#200812057913.Details
kitchen & bath remodeling, remove non-structural wall. convert partial crawl space to bedroom & new bath @ ground floor. some structural work on 2nd floor under bpa#200812057913. | $50,000 |
| Apr 1, 2009 | Completed final sign-off May 2009 | 3151 Franklin St | bath room remodel:re-tile shower wall and floor.change bathroom fixtures.kitchen remodel:new counter & cabinets(new tiles at kchn floor) refinish extg hardwood floors in entire unit #11. located on 3rd floor.Details
bath room remodel:re-tile shower wall and floor.change bathroom fixtures.kitchen remodel:new counter & cabinets(new tiles at kchn floor) refinish extg hardwood floors in entire unit #11. located on 3rd floor. | $10,000 |
| Sep 8, 2006 | Completed final sign-off Jan 2007 | 220 Santa Paula Av | revision to floor plan (internal), switche bath and laundry per plans at basement, 200602225184Details
revision to floor plan (internal), switche bath and laundry per plans at basement, 200602225184 | |
| Aug 11, 2005 | Completed final sign-off Apr 2007 | 1714 12th Av | (1) kitchen/(2) bathroom. inspector to meet w/contractor pior to start of job. if less than 2/3 intDetails
(1) kitchen/(2) bathroom. inspector to meet w/contractor pior to start of job. if less than 2/3 int | $6,000 |
| Apr 23, 2004 | Expired or cancelled expired Jan 2006 | 1819 43rd Av | add bathroom on lower level, new furnace, new windows, paint, demo deck & stairsDetails
add bathroom on lower level, new furnace, new windows, paint, demo deck & stairs | $25,000 |
| Jan 28, 2004 | Expired or cancelled expired Feb 2005 | 283 Graystone Tr | kitchen remodel new cabinets & counter. 2 bathroom remodels new fixtures + tileDetails
kitchen remodel new cabinets & counter. 2 bathroom remodels new fixtures + tile | $18,000 |
| Aug 21, 2003 | Expired or cancelled expired Jul 2004 | 160 25th Av | kitchen remodel, new cabinets wirling plumbing, tile, replace windows. 1/2 bath and bath remodel.Details
kitchen remodel, new cabinets wirling plumbing, tile, replace windows. 1/2 bath and bath remodel. | $20,000 |
| May 13, 2003 | Expired or cancelled expired May 2004 | 3876 Clay St | install recessed lights, replacing (e) master bathroom fixtures, replacing 2 (e) fireplacesDetails
install recessed lights, replacing (e) master bathroom fixtures, replacing 2 (e) fireplaces | $40,000 |
| Oct 23, 2001 | Expired or cancelled expired Apr 2002 | 198 El Verano Wy | to convert 1/2 bath to full bath @ g/fl. to document (e) family room + bedroom @ g/floorDetails
to convert 1/2 bath to full bath @ g/fl. to document (e) family room + bedroom @ g/floor | $10,000 |
| Sep 12, 2001 | Expired or cancelled expired Mar 2002 | 198 El Verano Wy | remodel kitchen, bathroom, dryrot repair (repair joists in lower bedroom)Details
remodel kitchen, bathroom, dryrot repair (repair joists in lower bedroom) | $25,000 |