Permit GraphShortlistSan Francisco building permits since 2000

Maap Corp Dba Save Energy Co

Contractor license
440356
State license record
Based in
Petaluma
On San Francisco permits
Jan 2000 to Feb 2026
Last 24 months
21 permits filed

496 permits since 2000: 248 completed, 5 in progress, 145 never finaled, 98 expired or cancelled.

Of the 145 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 132 are over 10 years old. 2 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 5Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 15 days from filing to permit and 446 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 9, 2023Completed
final sign-off Sep 2023
8 Sharon Stwindow replacement (10) total (e) wood. (8): (n) marvin woodclad wood (wood interior adn alum exterior) and (2) with marvin essential (bathroom) in kind retrofit install, u factor < or = 0.30
Details
Permit
202303093370
Status
complete
Filed
Mar 9, 2023
Permit issued
Mar 27, 2023
Final sign-off
Sep 13, 2023
Declared cost
$26,087
Address
8 Sharon St

window replacement (10) total (e) wood. (8): (n) marvin woodclad wood (wood interior adn alum exterior) and (2) with marvin essential (bathroom) in kind retrofit install, u factor < or = 0.30

Open the permit page

$26,087
Jun 9, 2022Completed
final sign-off Jun 2024
595 12th Avunit 4: window replacement (1) total in kind: retrofit install u-factor < or = to 0.30: not street visible (e) wood (n) vinyl in bathroom -tempered glass
Details
Permit
202206096020
Status
complete
Filed
Jun 9, 2022
Permit issued
Jun 21, 2022
Final sign-off
Jun 11, 2024
Declared cost
$1,827
Address
595 12th Av

unit 4: window replacement (1) total in kind: retrofit install u-factor < or = to 0.30: not street visible (e) wood (n) vinyl in bathroom -tempered glass

Open the permit page

$1,827