M S Warren Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Apr 2011 to Jun 2011
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2011 | Completed final sign-off Feb 2012 | 1062 Francisco St | work on #1062 - remodel guest bath- install toilet, pedestal sink, 2 lights , tile weinscott tile floor, no existing plumbing to be moved, exiting tub to stay, add 1 gfci. install iron railing at front steps, 1 side and on back deck to replace existing.Details
work on #1062 - remodel guest bath- install toilet, pedestal sink, 2 lights , tile weinscott tile floor, no existing plumbing to be moved, exiting tub to stay, add 1 gfci. install iron railing at front steps, 1 side and on back deck to replace existing. | $15,000 |