Back to bathroom remodel contractors
M M Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Sep 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2011 | Completed final sign-off Dec 2011 | 160 San Carlos St | unit b: (1) kitchen remodel, renew the bathroom toilet and sink. replace the bathroom tiles. no window work, lighting to comply with cec 150(k). no door work on this permit.Details
unit b: (1) kitchen remodel, renew the bathroom toilet and sink. replace the bathroom tiles. no window work, lighting to comply with cec 150(k). no door work on this permit. | $8,000 |
| May 27, 2011 | Completed final sign-off Jun 2012 | 178 Locksley Av | revision to p.a#2010/0903/0199, remove non-bearing walls, add area for washer/dryer in each unit. kitchen & bathroom remodel, all details not revised shall follow the approved p.a.# above.Details
revision to p.a#2010/0903/0199, remove non-bearing walls, add area for washer/dryer in each unit. kitchen & bathroom remodel, all details not revised shall follow the approved p.a.# above. | $20,000 |
| Mar 16, 2011 | Completed final sign-off May 2011 | 100 Broderick St | unit # 206: kitchen and bathroom remodel only (no window, door, ceiling or wall work on this permit)Details
unit # 206: kitchen and bathroom remodel only (no window, door, ceiling or wall work on this permit) | $8,000 |
| Oct 8, 2010 | Completed final sign-off Jan 2011 | 1560 Sacramento St | unit b kitchen and bath remodelDetails
unit b kitchen and bath remodel | $8,000 |
| Sep 3, 2010 | Completed final sign-off Jun 2012 | 178 Locksley Av | nov#201041498:replace water damage-ground flr:replace garage ceiling, entry & stairway; 2nd flr: replace ceiling & drywall; remodel (e) water damaged kitchen & bathrooms; 3rd flr: replace ceiling & drywall; remodel (e) kitchen & baths; replc ebroken roof framing; reinstall fire escape missing boltsDetails
nov#201041498:replace water damage-ground flr:replace garage ceiling, entry & stairway; 2nd flr: replace ceiling & drywall; remodel (e) water damaged kitchen & bathrooms; 3rd flr: replace ceiling & drywall; remodel (e) kitchen & baths; replc ebroken roof framing; reinstall fire escape missing bolts | $250,000 |
| Feb 15, 2008 | Completed final sign-off May 2008 | 2144 Grove St | kitchen and bath remodel, unit 1. no structural workDetails
kitchen and bath remodel, unit 1. no structural work | $3,000 |
| Feb 15, 2008 | Completed final sign-off Apr 2008 | 765 Ofarrell St | kitchen and bath remodel. unit 27 only. no structural workDetails
kitchen and bath remodel. unit 27 only. no structural work | $3,000 |