Back to bathroom remodel contractors
M Karkori Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Jan 2010
- Last 24 months
- 0 permits filed
30 permits since 2000: 25 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2009 | Expired or cancelled expired Oct 2024 | 31 Uranus Tr | convert storage level & crawl space to (n) 1st. & 2nd. flrs. w/ 3-bedrms, 2-baths, family rm., craft rm.. replace (e) stairway from ground level to (n) 2nd. flr. add deck from (n) 2nd. flr. @ rear yard. add stairs from (n) 1st. flr. to rear yard.Details
convert storage level & crawl space to (n) 1st. & 2nd. flrs. w/ 3-bedrms, 2-baths, family rm., craft rm.. replace (e) stairway from ground level to (n) 2nd. flr. add deck from (n) 2nd. flr. @ rear yard. add stairs from (n) 1st. flr. to rear yard. | $150,000 |
| Jun 17, 2008 | Completed final sign-off Dec 2008 | 560 Haight St | work @ unit# 208 only. replace fixtures in existing 1 bathroom, re-tile & paint floor, ceiling & walls.Details
work @ unit# 208 only. replace fixtures in existing 1 bathroom, re-tile & paint floor, ceiling & walls. | $14,700 |
| Mar 24, 2005 | Completed final sign-off Dec 2005 | 284 Duncan St | new bath fixtures,plumbing.new kitchen cabs,plumbing.new flooring,new sheetrock.electrical-kitchen,Details
new bath fixtures,plumbing.new kitchen cabs,plumbing.new flooring,new sheetrock.electrical-kitchen, | $35,000 |
| Sep 1, 2000 | Completed final sign-off Mar 2001 | 117 St Marys Av | kitchen & bathroom remodel, replace cabinets, fixtures, tiles,Details
kitchen & bathroom remodel, replace cabinets, fixtures, tiles, | $20,000 |