Back to bathroom remodel contractors
M K Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- May 2012 to Jun 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 20 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Jun 2025 | 1047 Mississippi St | unit 1 - remove toilet, repair damage, reinstall toilet, paint bathroom. replace approximately 9 sqft of 5/8" sheetrock, tape smooth.Details
unit 1 - remove toilet, repair damage, reinstall toilet, paint bathroom. replace approximately 9 sqft of 5/8" sheetrock, tape smooth. | $5,000 |