M G Construction Corporation
- Based in
- Rio Linda
- On San Francisco permits
- Jul 2013 to Oct 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 746 Great Hy | unit 3, 4th fl: demo 2 kitchen interior walls. new walls in kitchen including new shear wal to replace existing 4th flDetails
unit 3, 4th fl: demo 2 kitchen interior walls. new walls in kitchen including new shear wal to replace existing 4th fl | $3,000 |
| Jul 30, 2013 | Completed final sign-off Jan 2014 | 746 Great Hy | paint interior, replace trips & baseboards, replace tile, faucets, lights in 2 bathrooms. replace lights, plugs, switches. install wood flooring, paint cabinets. replace 4 windows, not visible from the street. replace kitchen counters, windows in kind.Details
paint interior, replace trips & baseboards, replace tile, faucets, lights in 2 bathrooms. replace lights, plugs, switches. install wood flooring, paint cabinets. replace 4 windows, not visible from the street. replace kitchen counters, windows in kind. | $89,000 |