Back to bathroom remodel contractors
M F Sanchez Construction & Painting
- Based in
- San Pablo
- On San Francisco permits
- Aug 2007 to Apr 2021
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 8 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2020 | Completed final sign-off Jul 2020 | 436 Murray St | moving laundry to 1/2 bathroom water closet. add a toilet to (e) bathroom. moving (e) kitchen to (e)dining area. (e) kitchen to be living room. updating/adding electrical subpanel.Details
moving laundry to 1/2 bathroom water closet. add a toilet to (e) bathroom. moving (e) kitchen to (e)dining area. (e) kitchen to be living room. updating/adding electrical subpanel. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Aug 2018 | 135 Holladay Av | revision to app#2017-10-05-0555. replace in kind upper bathroom; toilet, shower and soaking tub, toilet and electrical fixtures. lower bathroom; replace in kind. shower, toilet and vanity, electrical fixtures. (e) storage space to be converted to new bedroom, bathroom and denDetails
revision to app#2017-10-05-0555. replace in kind upper bathroom; toilet, shower and soaking tub, toilet and electrical fixtures. lower bathroom; replace in kind. shower, toilet and vanity, electrical fixtures. (e) storage space to be converted to new bedroom, bathroom and den | $12,000 |
| Oct 31, 2017 | Expired or cancelled cancelled Jan 2026 | 135 Holladay Av | convert storage and laundry rm into bdrm, bath, and den. ref 201710050555, kitchen remodel maher not reqDetails
convert storage and laundry rm into bdrm, bath, and den. ref 201710050555, kitchen remodel maher not req | $22,000 |
| Jan 14, 2014 | Completed final sign-off Mar 2014 | 179 Julian Av | g/f common area 1 bathroom - replace shower and toilet on (e) area ; replace lightings and switches. to comply with cec150(k) 10to comply with 201147286 items 7,8 and 9, install grab bars in shower and toiletDetails
g/f common area 1 bathroom - replace shower and toilet on (e) area ; replace lightings and switches. to comply with cec150(k) 10to comply with 201147286 items 7,8 and 9, install grab bars in shower and toilet | $790 |