Back to bathroom remodel contractors
M F Construction And Renovation Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2007 to Jul 2026
- Last 24 months
- 10 permits filed
54 permits since 2000: 43 completed, 4 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 2011 Vallejo St | unit 1: remodel bathroom one toilet, one shower, one sink.Details
unit 1: remodel bathroom one toilet, one shower, one sink. | $15,000 |
| Nov 14, 2025 | Completed final sign-off May 2026 | 58 Cameo Wy | upstairs bathroom remodel in kind(permit revision to #202508132942)like for like. no removal of wallsDetails
upstairs bathroom remodel in kind(permit revision to #202508132942)like for like. no removal of walls | $20,000 |
| Sep 3, 2025 | Completed final sign-off Dec 2025 | 750 03rd Av | remodel (1) shower room and bathroom in kind. no structural work.Details
remodel (1) shower room and bathroom in kind. no structural work. | $12,000 |
| Aug 14, 2025 | In progress issued Aug 2025 | 3690 18th St | lowering of the ground fl to match sidewalk elvation, remove concrete ramp at entry and lowering (e) door. all work within building envelope. replace 1 post w/ 2 post at center beam. new ada unisex bathroom. ti under separate permit.Details
lowering of the ground fl to match sidewalk elvation, remove concrete ramp at entry and lowering (e) door. all work within building envelope. replace 1 post w/ 2 post at center beam. new ada unisex bathroom. ti under separate permit. | $50,000 |
| Jan 21, 2025 | Completed final sign-off Jul 2025 | 200 Santa Paula Av | remodel kitchen (50%) & bathroom. in-kind at same floor layout. no moving walls. fixtures to remain in the same location. kitchen approx 108 sq ft. bathroom approx. 60 sq ft.Details
remodel kitchen (50%) & bathroom. in-kind at same floor layout. no moving walls. fixtures to remain in the same location. kitchen approx 108 sq ft. bathroom approx. 60 sq ft. | $32,000 |
| Mar 22, 2024 | Completed final sign-off Jun 2024 | 2939 Divisadero St | remodel upstairs bathroom in kind. remove bathtub, new shower, vanity and toilet.Details
remodel upstairs bathroom in kind. remove bathtub, new shower, vanity and toilet. | $8,500 |
| Jun 20, 2023 | Completed final sign-off Mar 2024 | 1998 Pacific Av | unit 303: remodel 1 kitchen, 2 bathroom, and (e) laundry room in kind. non structural.Details
unit 303: remodel 1 kitchen, 2 bathroom, and (e) laundry room in kind. non structural. | $21,000 |
| Jul 23, 2021 | Never finaled issued Jul 2021, no final | 158 Alpine Tr | interior remodel of 158 alpin to include removal of walls at (e) pantry and storage. infill of one wall of (e) pandtry. interior remodel of 160 alpine: to include removal of wall between kitchen and living room, bathroom reconfiguration.Details
interior remodel of 158 alpin to include removal of walls at (e) pantry and storage. infill of one wall of (e) pandtry. interior remodel of 160 alpine: to include removal of wall between kitchen and living room, bathroom reconfiguration. | $40,000 |
| Jun 18, 2020 | Completed final sign-off Oct 2020 | 58 Cameo Wy | remodel 2 (e) 8x5 bathrooms. replace in-kind:new toilets, new tub, shower, new vanity all in same locations.Details
remodel 2 (e) 8x5 bathrooms. replace in-kind:new toilets, new tub, shower, new vanity all in same locations. | $8,500 |
| Jan 3, 2019 | Completed final sign-off Oct 2019 | 3572 Pierce St | repair fire damage to kitchen and bath inkind - kitchen cabinets, sectionof wall ceiling tiles, etc.Details
repair fire damage to kitchen and bath inkind - kitchen cabinets, sectionof wall ceiling tiles, etc. | $25,000 |
| Oct 30, 2017 | Completed final sign-off May 2018 | 2967 23rd Av | to repair water damage. remodel 3 bathrooms & kitchen. all work to be in-kind.Details
to repair water damage. remodel 3 bathrooms & kitchen. all work to be in-kind. | $78,500 |
| Jun 27, 2017 | Completed final sign-off May 2018 | 25 San Jacinto Wy | remodel of extg kitchen, powder room on lower level and remodel of 2 bathrooms on upper level. no exterior work as part of this permit.Details
remodel of extg kitchen, powder room on lower level and remodel of 2 bathrooms on upper level. no exterior work as part of this permit. | $50,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 1143 Clayton St | full bathroom remodel, new bathtub, toilet, shower, lights, vanity; kitchen cabinets countertop & door replacements.Details
full bathroom remodel, new bathtub, toilet, shower, lights, vanity; kitchen cabinets countertop & door replacements. | $17,000 |
| Mar 8, 2017 | Completed final sign-off Aug 2018 | 526 34th Av | remodel 3 bathrooms.Details
remodel 3 bathrooms. | $30,000 |
| Jan 29, 2015 | Completed final sign-off Jan 2016 | 237 Avila St | kitchen & bath remodel - addition of bathroom, family room & bedroom on lower level & roof deck @ 3rd floor. n/a maher ordinanceDetails
kitchen & bath remodel - addition of bathroom, family room & bedroom on lower level & roof deck @ 3rd floor. n/a maher ordinance | $240,000 |
| Dec 11, 2012 | Completed final sign-off Apr 2013 | 242 Denslowe Dr | new beam in kitchen, addition of new bathroom. extg bathroom remodel at 2nd floor. infull light well can't be seen from street.Details
new beam in kitchen, addition of new bathroom. extg bathroom remodel at 2nd floor. infull light well can't be seen from street. | |
| Feb 22, 2012 | Completed final sign-off Jun 2012 | 1628 Rivera St | remodel existing kitchen, bath, and closetDetails
remodel existing kitchen, bath, and closet | $30,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 145 San Fernando Wy | bathroom remodel. move 2 doors approx. 8". add doorway to closet, add showerpan. add new wall between closet.Details
bathroom remodel. move 2 doors approx. 8". add doorway to closet, add showerpan. add new wall between closet. | $9,500 |
| Jun 1, 2009 | Completed final sign-off Sep 2009 | 440 Urbano Dr | remodel kitchen, demo non load bearing wall at kitchen/nook. remodel bath.Details
remodel kitchen, demo non load bearing wall at kitchen/nook. remodel bath. | $35,000 |