Back to bathroom remodel contractors
M D C Builders
- Based in
- Vacaville
- On San Francisco permits
- Jan 2009 to Apr 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 5 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 137 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2010 | Never finaled issued Feb 2011, no final | 42 Seward St | replace/repair foundation ftgs &wall. excavate dirt, brace struc, install new beam to span approx.14'. extend wall &convert bsmnt sto stor space incl. work rm, storag, full bath, new dr,wdws, new pull lader btn grg andf bsmnt, upgrade elec, plbg. pave side yd, replace fence in back yd 6' from grade.Details
replace/repair foundation ftgs &wall. excavate dirt, brace struc, install new beam to span approx.14'. extend wall &convert bsmnt sto stor space incl. work rm, storag, full bath, new dr,wdws, new pull lader btn grg andf bsmnt, upgrade elec, plbg. pave side yd, replace fence in back yd 6' from grade. | $85,000 |