M B L Construction
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2002 to Jan 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 7 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2011 | Completed final sign-off Jun 2011 | 2770 San Bruno Av | unit #3 & #5-comply with nov# 2011309011 dated 5/10/11-replace dry rot members of 4'x9' cantilever decksDetails
unit #3 & #5-comply with nov# 2011309011 dated 5/10/11-replace dry rot members of 4'x9' cantilever decks | $48,000 |
| Feb 8, 2010 | Completed final sign-off Apr 2010 | 2760 San Bruno Av | to comply w/nov#200922331; replace dry-rot deck appox. 40"x110" including cantilever joist 2"x6" flooring & railings. repair stairway by 1st. landing in bldg. 2760.Details
to comply w/nov#200922331; replace dry-rot deck appox. 40"x110" including cantilever joist 2"x6" flooring & railings. repair stairway by 1st. landing in bldg. 2760. | $3,500 |