Back to bathroom remodel contractors
M A R E Contractor Inc
- Based in
- Antioch
- On San Francisco permits
- May 2008 to Aug 2016
- Last 24 months
- 0 permits filed
31 permits since 2000: 19 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2016 | Expired or cancelled cancelled Jan 2026 | 535 Cordova St | bathroom:r&r sheetrock, remove non-permitted bathroom. no structural workDetails
bathroom:r&r sheetrock, remove non-permitted bathroom. no structural work | $28,400 |
| Apr 5, 2016 | Completed final sign-off Jun 2016 | 1022 Powell St | bathroom remodel - install new shower built up pan, install exhaust fan, install gfci, new tile.Details
bathroom remodel - install new shower built up pan, install exhaust fan, install gfci, new tile. | $19,800 |
| Oct 16, 2009 | Completed final sign-off Mar 2010 | 184 Upland Dr | demolish and remodel bathroom. install new 6 recessed lights on ceiling, replace plumbing fixtures, install a fan, replace galvanized pipe with new copper pipe water line and install new tiles on wall. no structural work.Details
demolish and remodel bathroom. install new 6 recessed lights on ceiling, replace plumbing fixtures, install a fan, replace galvanized pipe with new copper pipe water line and install new tiles on wall. no structural work. | $9,000 |