Back to bathroom remodel contractors
Lyne Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 11 permits filed
31 permits since 2000: 27 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 in progress. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | In progress issued Apr 2026 | 3622 Broderick St | all interior remodel, no structural. kitchen remodel, replace water heater, bath #1 replace in-kind;, removal of defunct garage vent/ductDetails
all interior remodel, no structural. kitchen remodel, replace water heater, bath #1 replace in-kind;, removal of defunct garage vent/duct | $30,000 |
| Jan 8, 2026 | Completed final sign-off Feb 2026 | 6 Topaz Wy | replacement of sheetrock, small areas where it was removed due to water damage. retile floor of upper bathroom. replacement of kitchen upper cabinetry. replace carpet in upper haulway and back bedroom.Details
replacement of sheetrock, small areas where it was removed due to water damage. retile floor of upper bathroom. replacement of kitchen upper cabinetry. replace carpet in upper haulway and back bedroom. | $7,000 |
| Aug 13, 2025 | Completed final sign-off Aug 2026 | 434 17th Av | remodel of master bath.Details
remodel of master bath. | $49,200 |
| Mar 10, 2025 | Completed final sign-off Jul 2025 | 860 43rd Av | remodel of 1/floor (e) kitchen and(e) bathroom. add french door to rear yard.Details
remodel of 1/floor (e) kitchen and(e) bathroom. add french door to rear yard. | $64,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 1556 36th Av | remodel (1) kitchen and 2 bathrooms at 2nd & 3rd floor. replace 1 window in patio, and change sliding patio door to french door at patioDetails
remodel (1) kitchen and 2 bathrooms at 2nd & 3rd floor. replace 1 window in patio, and change sliding patio door to french door at patio | $91,000 |
| Jul 12, 2023 | Completed final sign-off Dec 2023 | 595 Diamond St | demo of 2 bathroomsDetails
demo of 2 bathrooms | $5,000 |
| May 16, 2022 | Completed final sign-off Jul 2022 | 2299 Sacramento St | bathroom remodel replacement in kind. apt 4.Details
bathroom remodel replacement in kind. apt 4. | $20,000 |
| Jun 10, 2021 | Completed final sign-off Apr 2023 | 2519 Pacific Av | ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only.Details
ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only. | $15,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 145 25th Av | bathroom remodel, replacement in-kindDetails
bathroom remodel, replacement in-kind | $8,000 |
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 198 Dolores St | #6: remodel 1 kitchen & 1 bath. demo floor and wall tiles in bathroom plus toilet sink and vanity. replace with (n) tile new plumbing valve new toilet to shower. in kitchen remove 1 cabinet, add 6 lights, paint cabinets and replace countertops.Details
#6: remodel 1 kitchen & 1 bath. demo floor and wall tiles in bathroom plus toilet sink and vanity. replace with (n) tile new plumbing valve new toilet to shower. in kitchen remove 1 cabinet, add 6 lights, paint cabinets and replace countertops. | $14,000 |