Lynden Floor Design
- Based in
- Lynden
- On San Francisco permits
- Sep 2010 to Nov 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2013 | Completed final sign-off Nov 2013 | 590 Bush St | revision to 201310169453 to document title 24 detailsDetails
revision to 201310169453 to document title 24 details | |
| Oct 16, 2013 | Completed final sign-off Nov 2013 | 590 Bush St | emergency repair to (e) lobby ceiling due to water damage. replace (e) gyp board ceiling & light fixtures. 5/8" type x gyp board. scope of work is not for a rated assemblyDetails
emergency repair to (e) lobby ceiling due to water damage. replace (e) gyp board ceiling & light fixtures. 5/8" type x gyp board. scope of work is not for a rated assembly | $18,234 |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 586 Bush St | replacement of existing windows in existing spaces, wood windows as per westeck plans, revision 2 sept 15, 2010, all windows replaced in building, 2nd flr and up to roof level, about 268 windowsDetails
replacement of existing windows in existing spaces, wood windows as per westeck plans, revision 2 sept 15, 2010, all windows replaced in building, 2nd flr and up to roof level, about 268 windows | $672,966 |